浇注工艺对钛高尔夫球头浇满率的影响

来源 :中国钛业 | 被引量 : 0次 | 上传用户:smtl520
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
高尔夫球头铸造是钛精密铸造的尖端技术,对于普遍壁厚小于1 mm的球头铸件,如何解决铸件浇不满问题是该项技术的关键,经过对400cc大球头和200cc小球头进行多次浇注实验,总结并设计了合理的球头浇道系统以及离心浇注工艺,使得小球头的浇满率达到97%以上,大球头浇满率达到90%以上,可以得到质量良好的铸件。 Golf head casting is the cutting-edge technology of titanium precision casting, for the general wall thickness of less than 1 mm of the ball casting, how to solve the problem of casting casting is the key to this technology, after the large ball and the 400cc 200cc ball head more Through the experiment of pouring, the reasonable ball sprue system and centrifugal pouring process are summarized and designed, the filling rate of the ball is over 97% and the filling rate of the ball is more than 90%, and the casting with good quality can be obtained .
其他文献
“Research on the Key Technology and Engineering of the Medical Cyclotron”is the core ability promotion project of“Long Teng 2020”science and technology inno
There are three beam lines in south direction of BRIF:two neutron source and single particle effect beam line.In 2016,the construction and commission of these b
The spent fuel dissolver is the key equipment in the reprocessing plant.In order to meet the experimental demand of nuclear criticality safety research,after ha
As the third generation nuclear system,the design life of AP1000 can reach more than 60 a.Since the operation of the nuclear power plant,spent fuel pool began t
北京放射性离子束装置(BRIF)是国家投资数亿元的大科学工程,现已竣工试运行,填补了我国在IS()L型放射性离子束装置方面的空白。该装置由一台强流质子回旋加速器、离子源、在
Shearing machine system,as the first part of the post-processing head end,has a pivotal role and the development of its equipment has been one of the difficulti
作为第3代核电系统,AP1000的设计使用寿命可达60 a以上。核电站开始运行后,乏燃料水池随之开始使用,因此需对乏池贮存格架的中子吸收体在60 a寿期内的有效性进行监测,以保证
Post irradiation examinations(PIE)on AFA-3G fuel rods were performed in CARR hotcell and 303 hotcell,the failure cause analysis was also conducted.The main meth
The CYCIAE-100 is a high intensity cyclotron.The beam intensity is 200μA.The energyrange is 75-100 MeV.The beam extraction system is made of the stripping targ
The superconducting coil system of CYCIAE-230 superconducting proton cyclotron consists of two coil windings,cryostat,GM coolers,and the liquid helium condenser