本文以成都市某工程为例,该工程房屋的主体结构系框架结构,由于其顶层使用功能的改变,需将原结构中的一根框架柱拆除。改造前按规定进行了质量现状鉴定;改造设计中根据该工程特点,采用了一种简单易行的托梁拔柱方法进行加固。该工程改造设计方案后经实际实施,结果证实该方案是可靠且便于实施的,在拆除目标框架柱后,相关区域的主体结构构件承载能力满足新使用条件下的安全性及正常使用的要求。
In this paper, a project in Chengdu, for example, the main structure of the project structure of the Department of the framework of the structure, due to changes in the top of its use of functions, the original structure of a frame column to be removed. Before the renovation, the quality status quo was appraised according to the regulations; according to the characteristics of the project, a simple and easy method of joist drawing and column reinforcement was adopted in the reformation design. After the engineering design was implemented, the results proved that the scheme was reliable and easy to implement. After the target frame was removed, the carrying capacity of the main structural members in the relevant area could meet the requirements of safety and normal use under the new conditions of use.