论文部分内容阅读
文章介绍了侯马北铁路枢纽现状概况,通过现场调研,并对侯马北枢纽及编组站的通过能力、解编能力进行分析的基础上,得出目前该枢纽存在的主要问题,结合现状提出了枢纽扩能改造建议。
This paper introduces the status quo of Houma North railway hub. Based on the field investigation and analysis of the passing capacity and disassembly ability of Houma North Hub and Marshalling Station, the main problems existing in this hub are pointed out and the status quo is proposed Hub expansion proposals.