论文部分内容阅读
简要介绍了大亚湾核电站换料设计的基本原理和内容,以及两个机组第四循环换料设计的主要结果,并与测量值作了比较。计算结果表明,两个机组的换料设计都满足了安全性准则和经济性要求;测量结果表明,理论预测值与实测值符合良好。
The basic principle and contents of refueling design of Daya Bay Nuclear Power Station are briefly introduced, and the main results of the fourth cycle refueling design of the two units are compared with the measured values. The calculation results show that both the refueling design of the two units meet the safety criteria and economic requirements. The measurement results show that the theoretical predictions and the measured values are in good agreement.