萧山机场综合布线工程分为航站楼室内综合布线和机场区建筑群光缆布线。航站楼室内布线主要为计算机网络系统(包括集成系统离港系统、航班信息显示系统、地下停车费管理系统、安检系统)的数据、图象传输和通信系统(包括内调电话、公用电话、公众电话系统)的话音传输。一期工程将近4000个信息点,是中国目前最大的重点机场项目之一。整个工程安装了西蒙超五类带防尘门免工具安装的MAX系列产品。
Xiaoshan Airport’s integrated cabling project is divided into the terminal interior integrated cabling and airport area buildings fiber optic cabling. The indoor wiring of the terminal building mainly includes data, image transmission and communication systems (including internal telephone and public telephone) of computer network systems (including integrated system departure system, flight information display system, underground parking fee management system, security inspection system). Voice over public telephone system. The first phase of the project has nearly 4,000 information points and is one of the largest major airport projects in China. The entire project is equipped with Simon’s Super Series 5 MAX-series products with dust-free door installation.