桥涵工程对我国经济发展意义重大,但项目设计及建设受不良地质影响较大。钻孔灌注桩后压浆技术能够有效提高桩体承载力。本文以安达跨牵出线特大桥工程为例,首先介绍后压浆技术提高桩体承载力的机理,进而阐述灌注桩后压浆施工工艺流程和预埋注浆管道制作工艺、注浆管的预埋布置及注浆施工顺序等关键施工要点,并给出此工程试桩数据,验证后压浆施工技术对提高桩体承载力的有效性,为后压浆技术在今后桥梁工程建设中的应用提供参考。
Bridge and culvert construction is of great significance to the economic development of our country, but the design and construction of the project are greatly affected by the adverse geology. Bored post-grouting technology can effectively improve the bearing capacity of the pile. In this paper, Anderson cross-over line super-large bridge project as an example, first introduced after grouting technology to improve the bearing capacity of the pile body mechanism, and then elaborated after the grouting pile grouting process and embedded grouting pipe manufacturing process, grouting pipe pre- Buried construction and grouting construction sequence and other key construction points and give the project test pile data to verify the effectiveness of grouting construction technology to improve the bearing capacity of piles for post grouting technology in the future construction of the bridge project for reference.