论文部分内容阅读
笔者于1984年6月至1985年6月的一年时间,赴日本研修、学习桥梁。接受单位是日本国福岛县会津工建社,这是一家专门从事中小型予应力混凝土上部结构的桥梁公司,先后在三个桥梁工地学习,采用顶推法施工的枝松桥就是其中一座。以下将该桥作简单介绍。一、工程概要 (一)工程内容工程名称:地方道整治工程; 地点:南会津郡下乡町大字枝松桥内; 工期:1984年12月6日至1985年10 月1日; 发包单位:田岛建设事务所;
The author in June 1984 to June 1985 one year time, went to Japan to study and study the bridge. The accepting unit is Aizu Gongshe Shek, Fukushima Prefecture, Japan. This is a bridge company specializing in small to medium-sized prestressed concrete superstructures. It has successively studied on three bridge sites and one of its branches is Sunsong Bridge which is constructed using the push method. The following will be a brief introduction of the bridge. I. Outline of the Project (I) Project Description Project Name: Local Road Improvement Project Location: Dazuzhi Songqiao, Xiaxiao Town, Nanhuijin County; Duration: December 6, 1984 to October 1, 1985; Contract Unit: Tajima Construction firm