论文部分内容阅读
本文结合在李渡长江大桥斜拉桥的施工过程中,对结构实施监控主要是通过对施工阶段的监测,调整结构实际状态与理论状态的偏差。
Combining with the construction process of LiDu Yangtze River Bridge Cable-Stayed Bridge, the monitoring of the structure is mainly through the monitoring of the construction stage to adjust the deviation between the actual state and the theoretical state of the structure.