The Severn Barrage and other tidal energy options:Hydrodynamic and power output modelling

来源 :Science in China(Series E:Technological Sciences) | 被引量 : 0次 | 上传用户:xxx555xxx777
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Details are given herein of the current main proposals for tidal energy provision from the Severn Estuary, in the UK, with particular emphasis being focused on the Severn Barrage project, as originally promoted by the Severn Tidal Power Group. In particular, emphasis has focused on assessing the potential hydro-environmental impacts and power outputs of a barrage across the estuary, with an unstructured grid, high resolution, model being developed and applied to the estuary to assess the implications of each of five shortlisted proposed schemes on the hydrodynamic, geomorphologic, flood risk and faecal indicator organism changes within the estuary. An outline is given of recent research on power refinements to the model to assess the options for power generation. The results show that the Severn Barrage has the potential to reduce the tidal currents in a highly dynamic estuary. This leads to the reduction of suspended sediment loads (particularly upstream of the barrage), an increase of light penetration within the water column and, potentially, an increase in the benthic bio-diversity and the level of aquatic life in the estuary. The results also show that the Severn Barrage will reduce markedly the risk of flooding upstream of the barrage and to a lesser extent downstream of the structure. In contrast the alternative options have far less impact on flood risk changes. In addition to the Severn Barrage some results are shown herein for a typical lagoon option, namely the Fleming Lagoon. Details are given herein of the current main proposals for tidal energy provision from the Severn Estuary, in the UK, with particular emphasis being focused on the Severn Barrage project, as originally promoted by the Severn Tidal Power Group. assessing the potential hydro-environmental impacts and power outputs of a barrage across the estuary, with an unstructured grid, high resolution, model being developed and applied to the estuary to assess the implications of each of five shortlisted proposed schemes on the hydrodynamic, geomorphologic, flood risk and faecal indicator organism changes within the estuary. An outline is given of recent research on power refinements to the model to assess the options for power generation. The results show that the Severn Barrage has the potential to reduce the tidal currents in a highly dynamic estuary. This leads to the reduction of suspended sediment loads (particularly upstream of the barrage), an increase o f light penetration within the water column and, potentially, an increase in the benthic bio-diversity and the level of aquatic life in the estuary. The results also show that the Severn Barrage will reduce markedly the risk of flooding upstream of the barrage and to In addition to the Severn Barrage some results are shown for a typical lagoon option, in the Fleming Lagoon.
其他文献
一个世纪以来,由于世界人口的增长、工农业生产的发展,加上战争和社会动乱,人类干预自然界的规模和强度不断扩大和深化,全球多处出现严重生态平衡失调现象。中国当前环境污染
【摘 要】近几年,随着公路工程建设在不断的增加,交通运输业也在迅速的发展,与此同时所带来的就是工程施工人员在大批的涌入到桥梁施工队伍当中。然而,因不同施工人员的专业素质以及技术水平参差不齐,并且存在为了加快施工进度以及追求最大化经济效益,所以往往就会忽视技术质量,导致工程质量方面的各种缺陷,甚至出现质量事故等。在施工过程中所造成的缺陷一般在短期内不会影响到桥梁的使用,也不会出现明显的不良影响,如果
我们国家的经济在不断的发展,建筑工程越来越多,在建筑的施工过程中,桩基作为高层建筑的基础在工程建设中被大量的采用.桩基工程作为建筑工程的基础,所以桩基的施工质量对于
本文主要针对高层建筑抗震结构设计的基本原则和发生地震时高层建筑的破坏特点以及高层建筑结构抗震设计的主要要点进行简要分析,仅供参考.
电梯安装工程全新的项目管理,就是运用系统的信息理论和方法,对电梯安装工程项目进行的计划、组织、指挥、协调和控制等专业活动,从电梯安装工程项目开始至工程项目完成,通过电梯
近年来我国公路工程建设的数量以及质量都有一定程度的提升,为了确保其发展,本文笔者从实际出发分析了如何做好公路工程的项目管理工作。
随着国内经济正在快速发展,在建筑幕墙施工的各环节中,安全事故的防范非常重要。另外,由于社会主义经建设的决速发展,在国际复杂的经济形势下,强化建筑幕墙施工的安全管理工作,有着
随着我国经济建设的高速发展,建设制度的日趋完善。建设工程索赔已成为工程造价管理的重要部分。工程造价管理在工程管理中具有重要作用,而在实际施工中,工程变更和索赔无法避免
由于各个电力公司的配网有所不同,所以并不是每个供电公司的电力配电自动化技术模式一样,因此,供电公司需要根据自身的具体情况,分析寻找合适自己的最佳模式,是自身获得更好更快的
随着经济的发展,建设工程项目风险对于企业造成很大的影响。因此,加强建设项目的风险预防和管理具有非常重要的意义。基于此,文章对建筑项目管理风险进行分析,以期能够提供一个借