大跨悬索桥加劲梁吊装阶段的施工控制中,吊装前的控制计算和吊装期间的监测十分关键。为消除主缆施工期间产生的误差对加劲梁施工的影响,并保证成桥后桥面线形符合设计要求,提出了一种反馈控制分析方法;采用有限元正装计算方法计算各吊装阶段施工控制参数的理论值以及主索鞍自由滑移量等,并根据该滑移量和索塔的抗弯能力确定索鞍的顶推时机和顶推量。通过对宜昌长江公路大桥的施工控制,得出了主缆跨中标高、主索鞍的滑移以及钢箱梁的开口角等在加劲梁吊装过程中的变化规律,并保证了施工过程中结构受力的安全以及加劲梁吊装完后桥面线形符合设计要求。
In the construction control of the hoisting stage of the long span suspension bridge stiffening girder, the control calculation before hoisting and the monitoring during hoisting period are very important. In order to eliminate the influence of error caused by main cable construction on the stiffening girder construction and ensure that the bridge deck shape meets the design requirements after the bridge is completed, a feedback control analysis method is proposed. The finite element formal calculation method is used to calculate the construction control parameters Of the theoretical value and the main saddle free slippage and so on, and according to the slippage and pylon bending capacity to determine the saddle push-push timing and thrust volume. Through the construction control of Yichang Changjiang River Highway Bridge, the variation law of the superstructure of the main cable span, the slippage of the main saddle and the opening angle of the steel box girder are obtained during the hoisting process of the stiffening girder, and the structure during construction After the safety of the force and the stiffening girder, the bridge shape meets the design requirements.