“九五”期间,安阳市水利水电基本建设在市委、市政府的正确领导下,在上级水利部门的大力支持下,先后完成了安阳河殷都桥段治理、漳河护岸一期、大功引黄、万金灌区技改、桑材干渠、红旗渠灌区技改等大中型项目,累计完成基建工程投资1.2亿多元。同时,还投资7000多万元完成了一大批节水和水土保持工程,投资1000多万元完成了水库、河道的岁修及应急度汛工程。这些工程的建成,对安阳九五期间的经济发展做出了巨大贡献,同时,对安阳十五期间经济的可持续发展展奠
“Nine five ” period, Anyang City, water conservancy and hydropower capital construction under the correct leadership of the municipal government, with the strong support of the higher water conservancy department, has completed the Anyang River Yin Du bridge management, Zhanghe bank protection, Diversification of the Yellow River, Wanjin irrigation area technical transformation, mulberry timber canals, Hongqiqu Irrigation District technical transformation and other large and medium-sized projects, completed a total investment of infrastructure construction more than 120 million yuan. At the same time, also invested more than 7000 million completed a large number of water conservation and soil and water conservation projects, invested more than 10 million yuan to complete the reservoir and river courses and flood emergency project. The completion of these projects made great contributions to the economic development of Anyang during the Ninth Five-year Plan period. At the same time, it laid the foundation for the sustainable economic development during the 15th Anyang