论文部分内容阅读
在松花江上游,吉林市东南24公里的地方,聳立着我国目前最大的水力發电厂——丰滿發电厂。第一个五年計划所規定的丰滿發电厂改建与扩建工程,已經在1956年提前完成了。日本帝国主义和国民党统治时代遺留下來的旧面貌已經变成了历史的陈迹。丰滿發电厂現在是我国目前容量最大、發电量最多的一个發电厂。它拥有七台完全自动化的水輪發电机,設备容量將近50万千瓦。它全年發电量占到全国总發电量的八分之一左右。它發出的电力,輸送到东北地区許多城市和工矿企業中,供应生产和建設的需要。它是我国社会主义工業建设中重要的电力基地之一。
In the upper reaches of the Songhua River, 24 kilometers southeast of Jilin City, stands the largest hydropower plant in China, the Fengman Power Plant. The first five-year plan provided for plum power plant reconstruction and expansion project, completed in 1956 ahead of schedule. The old look left over by the Japanese imperialists and Kuomintang rule has become a historical relic. Full power plant is now China’s largest capacity, the largest generating capacity of a power plant. It owns seven fully automated hydroelectric generators with equipment capacity of nearly 500,000 kilowatts. Its annual power generation accounts for about one eighth of the country’s total power generation. The electricity it sends is delivered to many cities and industrial and mining enterprises in the northeast region to supply the needs of production and construction. It is one of the important electricity bases in the socialist industrial construction of our country.