论文部分内容阅读
摘要:随着中国电信3G业务的不断发展,政企行业应用的发展,以及校园营销的推广,DO用户逐月不断递增,加上用户行为的“簇聚性”“二八效应”、使得高数据用户聚集小区EVDO四载波已经已无法满足用户感知需求,在800MHZ频段部分热点区域DO载频已无频点可用,且现阶段密集城区新增基站相当困难,为打破容量瓶颈,在某城市借助专业设备成功完成了3改6扇区的裂化试点工作,改造后评估效果良好。
关键词:扇区裂化;载波;高话务
中图分类号:TP3 文献标识码:A 文章编号:1009-3044(2018)03-0251-04
Abstract: With the continuous development of China Telecom 3G business, the development of the enterprise in industry application, as well as the promotion of campus marketing, DO users are constantly increasing month by month, coupled with user behavior "cluster" and "28 effect", the high data users gather cell EVDO four carrier already has been unable to meet the perceived needs of users, hot spots in 800 MHZ band part DO carrier frequency has no frequency points are available, and at this stage of the new base of dense urban area is very difficult to break the bottleneck capacity, in a city with the help of professional equipment successfully completed the cracking of the pilot work, 3 to 6 sectors after transforming evaluation effect is good..
Key words: sector cracking; carrier; high traffic
1 問题描述
随着中国电信3G业务的不断膨胀发展,用户行为的“簇聚性”、政企行业应用的发展,以及校园营销的推广,DO用户逐月不断递增,使得高数据用户聚集区EVDO四载波也已无法满足市场发展需求,在800M频段部分热点区域DO载频已无频点可用,且现阶段密集城区新增基站相当困难,从1月最新的DO数据情况来看,平均每日DO话务量约50万Erl,且每日话务量总体呈现逐渐上升趋势。1月较10年12月EV-DO的吞吐量、活跃用户数、时长,都呈大幅上升趋势。为打破容量瓶颈,提供更高的网络承载能力,支撑市场业务发展,提升EVDO网络承载能力和客户感知,采用6扇区裂分改造扩容技术迫在眉睫[1]。
2 问题分析
2.1 问题基站分析
某城市中某基站配置为1X双载频、DO为3载频,该基站下用户对数据业务需求较大,DO话务量一直居高不下,用户反映特别是网上上网速度较慢,1小区的4号载频DO话务量最高,3个小区的DO话务总量基本持平,每天该基站DO流量平均约35个G,3个小区流量基本持平。为提高该基站网络容量及用户使用感知,因此对该基站实行3改6扇区改造[2]。
2.2 六扇区改造原理
1) 新技术—新型劈裂天线
新型“劈裂天线”是在一副天线罩实体中集成了两根双极化天线,采用波束赋形技术,生成两个窄波束扇区。
通过将普通三扇区基站的天线更换为劈裂天线后,三扇区变成六扇区。
2) 基站主设备:
主设备采用中兴支持6个RSU的 BS8800,可提供最大36载扇的射频容量。需增加RSU及其他相关的CHV板卡,即可最大支持6扇区。
3) 实现原理
原有设备共接6根馈线,每副天线分别接两根馈线于3个RSU上,改造后共需12根馈线,每副劈裂天线上接4根馈线分别接于原有3个RSU及新增3个RSU上,实现将原有的3个小区扩充为6小区。
3 解决方案
1) 扇区改造实现方案
某城市目前现网配置S222 S333,改造为S222222 S333333,从3扇区裂化为6扇区。
1) 电源:现网配置S222 S333大约功耗1000W,改造为S222222 S333333后,功耗大约为2000W,经核实现有电源配置能满足需求;
2) 信道板:CHV0(CHV1)每个信道板可支持12个1X载扇,CHDO(CHD1)信道板每个可支持6个DO载扇。故由S222 S333改造为S222222 S333333,由于1X采取同PN模式,该基站原有2个CHD0板,故本次改造需新增1个CHD0信道板,改造后最大支持1X 12载扇,DO 18载扇。
3) 传输:(每1X载扇按1M估计,每DO载扇按2M估计)。由于SA只能出8E1,且没有槽位给SE提供更多的E1,所以只能开通FE口,增加IP化传输方式,改造为S222222 S333333传输带宽需求=(12*1(1X) 3*6*2(DO)=48M)目前SA支持16M带宽,本站IP化需FE口提供48-16=32M带宽。)
4) 馈窗:原有馈窗利旧,馈线孔经设计院核实能满足本次改造需求。 5) 走线架:利旧原有室内、外走线架,经设计院能满足本安装次改造需求。
6) 塔桅:利旧原有楼顶15米升高架,经设计院核实承重与风阻等均满足需求。
7) PN规划:
如改造站点3个扇区的1X、DO话务量均很高,则需重新规划1组PN,用于1X及DO小区,PN规划时需注意PN复用所带来的影响。
如改造站点主要是DO话务较高,可以采取1X使用同PN组网方式、DO采取异PN方式,故只需要规划1组PN用于DO小区,PN规划时需注意PN复用所带来的影响。本次试点改造区域-温江区委党校采取的即为1X同PN小区模式。
1X同PN小区模式配置:参考小区是指扇区裂化前原有小区,非参考小区是指扇区裂化后新增小区,若该小区需要配置同PN,无论是参考小区还是非参考小区,都配置为是[1]
参考小区:该参数指定同PN模式的参考小区,同PN小区都是用参考小区的参数来工作。无论是参考小区还是非参考小区,都配置为参考小区的小区号。比如:这里配置参考小区2,那么同PN下的2小区和3小区都是用2小区的参数工作。
8) 邻区配置:
邻区配置原则同3扇区站点,严格按照邻区配置规范进行操作。如1X使用同PN模式不需要再配置邻区。
注意,1X分裂前后小区对应关系: 分裂前0小区 ——分裂后 0、3同PN(0小区为参考小区,3小区为非参考小区,继承参考小区的参数、邻区);分裂前1小区 ——分裂后 1、4同PN(1小区为参考小区,4小区为非参考小区,继承参考小区的参数、邻区);分裂前2小区——分裂后 2、5同PN(2小区为参考小区,5小区为非参考小区,继承参考小区的参数、邻区)。可参考图 4。
9) 功率规划:
功率参数分裂前,温江区委党校基站1X 0、1载频均为20W;DO 6载频为20W,4、5载频为10W,共80W;分裂后,沿用分裂前的参数。其余参数也沿用分裂前的参数。
4 取得效果
6 扇区裂化工程施工完成以后,某城市网优中心6扇区裂化的网络效果评估工作,网络效果评估分为2部分:网络覆盖指标评估、网络KPI指标评估。
4.1 网络覆盖指标评估
需在扇区裂化前,提前完成相应网络覆盖质量数据采集及评估分析,待扇区改造完成后,开展数据对比评估分析,评估包括1X网络覆盖评估和DO网络覆盖评估2部分。
1) 1X网络质量评估:对比分析裂化前后的基站覆盖情况,Ec/Io、Rx、Tx等指标变化情况,并严格按照测试规范进行。
2) DO网络质量评估:对比分析扇区裂化前后的C/I、DRC申请速率、前向RLP速率等变化情况,并严格按照测试规范进行。
3) 用户投訴:裂化扇区前后要重点关注试点区域内用户投诉等情况,对比裂化后是否用户投诉量会增加。
4.2 关键KPI指标评估
提取裂化前与裂化后一周(或更长)关键数据KPI指标进行对比评估。KPI关键指标评估由2部分组成,1X KPI关键指标评估及DO KPI关键指标评估[3]。
1) 1X语音关键KPI指标评估
重点评估的1X KPI关键指标有如下:1X语音话务量、1X业务信道掉话率、1X语音呼叫建立成功率、语音软切换成功率、语音软切换比例等指标。
2) DO关键KPI指标评估
重点评估的DO KPI关键指标有如下:DO话务量、DO连接成功率、时隙占用率、DO掉线率、前向RLP吞吐量等指标。
5 总结推广
1) 通过3扇区分裂为6扇区,特别是在DO高话务热点忙小区,可以有效地降低DO时隙利用率,提高系统容量;采用6扇区分裂可以通过优化将网络覆盖方面的影响基本消除,同时可以优化提升网络指标;在1X话务量不高,而DO高话务热点区域,采用1X同PN的方式可以减少PN复用和邻区规划的困难及对现网带来的影响,同时可实现网络容量的提升。
2) 该案例适用场景:DO高话务密集性区域,如居民小区,且已无DO频点可用;区域内新增基站困难、如大学校园等区域。3扇区分裂为6扇区要根据小区覆盖的情况,如基站在用户区域的中心,切覆盖区域较为宽阔,可以适用;如果覆盖区域是狭长地带或者更软切换话务过高,则不宜裂化。如三个扇区的DO话务高,则可以将3扇区扩容到6扇区;若仅一个扇区的DO话务高,则可以单独裂化该扇区,将3扇区扩容为4扇区。
3) 劈裂天线可能存在较高的软切换、更软切换,后期的优化工作将相当重要。
6 工程中需要注意事项
1) 馈孔:如基站为C网新建工程,则均采用以下6洞18孔馈窗,改造前仅占用9个孔洞,完全能满足改造需求,如馈窗孔洞已使用完或无法满足改造要求,则需重新在原馈窗附近重新开馈孔新增馈窗。
2) 走线架:如基站为C网新建工程,则室、内外均采用400mm宽走线架布放馈线,室外馈线采用3排2列的三联卡固定馈线,有足够的空间可满足改造新增馈线的布放,如馈线过多已无法满足要求,则需新增走线架布放新增馈线。
3) 提前检查基站电源,确认配电柜是否支持6扇区,配电柜空开和熔丝是否满足要求;
4) 检查室外接地排是否能满足接驳要求,如地排孔洞无法满足改造需求 ,则需新增地排于原地排旁,且需用95铜芯线有效连接;
5) 塔桅:由于改造天线采用劈裂天线,该天线自重及风阻负荷均大于普通天线,塔桅均需视具体情况由铁塔设计单位现场查勘后出具改造设计方能进行实施。
附录:劈裂天线主要指标
新型“劈裂天线”是在一副天线罩实体中集成了两根双极化天线,采用波束赋形技术,生成两个窄波束扇区。
天线主要指标如下表:
劈裂天线水平方向图与普通33度天线水平方向图比较,如图10所示。
普通天线更换为劈裂天线后,如图11所示。
参考文献:
[1] 中国电信集团公司. 中国电信CDMA网络隐性问题专题优化指导书[Z]. 2010.
[2] 华为技术有限公司. CDMA系统RSSI异常分析指导书[Z].
[3] 盛骤, 谢式千, 潘承毅. 概率论与数理统计[M]. 3版.北京: 高等教育出版社, 2000.
关键词:扇区裂化;载波;高话务
中图分类号:TP3 文献标识码:A 文章编号:1009-3044(2018)03-0251-04
Abstract: With the continuous development of China Telecom 3G business, the development of the enterprise in industry application, as well as the promotion of campus marketing, DO users are constantly increasing month by month, coupled with user behavior "cluster" and "28 effect", the high data users gather cell EVDO four carrier already has been unable to meet the perceived needs of users, hot spots in 800 MHZ band part DO carrier frequency has no frequency points are available, and at this stage of the new base of dense urban area is very difficult to break the bottleneck capacity, in a city with the help of professional equipment successfully completed the cracking of the pilot work, 3 to 6 sectors after transforming evaluation effect is good..
Key words: sector cracking; carrier; high traffic
1 問题描述
随着中国电信3G业务的不断膨胀发展,用户行为的“簇聚性”、政企行业应用的发展,以及校园营销的推广,DO用户逐月不断递增,使得高数据用户聚集区EVDO四载波也已无法满足市场发展需求,在800M频段部分热点区域DO载频已无频点可用,且现阶段密集城区新增基站相当困难,从1月最新的DO数据情况来看,平均每日DO话务量约50万Erl,且每日话务量总体呈现逐渐上升趋势。1月较10年12月EV-DO的吞吐量、活跃用户数、时长,都呈大幅上升趋势。为打破容量瓶颈,提供更高的网络承载能力,支撑市场业务发展,提升EVDO网络承载能力和客户感知,采用6扇区裂分改造扩容技术迫在眉睫[1]。
2 问题分析
2.1 问题基站分析
某城市中某基站配置为1X双载频、DO为3载频,该基站下用户对数据业务需求较大,DO话务量一直居高不下,用户反映特别是网上上网速度较慢,1小区的4号载频DO话务量最高,3个小区的DO话务总量基本持平,每天该基站DO流量平均约35个G,3个小区流量基本持平。为提高该基站网络容量及用户使用感知,因此对该基站实行3改6扇区改造[2]。
2.2 六扇区改造原理
1) 新技术—新型劈裂天线
新型“劈裂天线”是在一副天线罩实体中集成了两根双极化天线,采用波束赋形技术,生成两个窄波束扇区。
通过将普通三扇区基站的天线更换为劈裂天线后,三扇区变成六扇区。
2) 基站主设备:
主设备采用中兴支持6个RSU的 BS8800,可提供最大36载扇的射频容量。需增加RSU及其他相关的CHV板卡,即可最大支持6扇区。
3) 实现原理
原有设备共接6根馈线,每副天线分别接两根馈线于3个RSU上,改造后共需12根馈线,每副劈裂天线上接4根馈线分别接于原有3个RSU及新增3个RSU上,实现将原有的3个小区扩充为6小区。
3 解决方案
1) 扇区改造实现方案
某城市目前现网配置S222 S333,改造为S222222 S333333,从3扇区裂化为6扇区。
1) 电源:现网配置S222 S333大约功耗1000W,改造为S222222 S333333后,功耗大约为2000W,经核实现有电源配置能满足需求;
2) 信道板:CHV0(CHV1)每个信道板可支持12个1X载扇,CHDO(CHD1)信道板每个可支持6个DO载扇。故由S222 S333改造为S222222 S333333,由于1X采取同PN模式,该基站原有2个CHD0板,故本次改造需新增1个CHD0信道板,改造后最大支持1X 12载扇,DO 18载扇。
3) 传输:(每1X载扇按1M估计,每DO载扇按2M估计)。由于SA只能出8E1,且没有槽位给SE提供更多的E1,所以只能开通FE口,增加IP化传输方式,改造为S222222 S333333传输带宽需求=(12*1(1X) 3*6*2(DO)=48M)目前SA支持16M带宽,本站IP化需FE口提供48-16=32M带宽。)
4) 馈窗:原有馈窗利旧,馈线孔经设计院核实能满足本次改造需求。 5) 走线架:利旧原有室内、外走线架,经设计院能满足本安装次改造需求。
6) 塔桅:利旧原有楼顶15米升高架,经设计院核实承重与风阻等均满足需求。
7) PN规划:
如改造站点3个扇区的1X、DO话务量均很高,则需重新规划1组PN,用于1X及DO小区,PN规划时需注意PN复用所带来的影响。
如改造站点主要是DO话务较高,可以采取1X使用同PN组网方式、DO采取异PN方式,故只需要规划1组PN用于DO小区,PN规划时需注意PN复用所带来的影响。本次试点改造区域-温江区委党校采取的即为1X同PN小区模式。
1X同PN小区模式配置:参考小区是指扇区裂化前原有小区,非参考小区是指扇区裂化后新增小区,若该小区需要配置同PN,无论是参考小区还是非参考小区,都配置为是[1]
参考小区:该参数指定同PN模式的参考小区,同PN小区都是用参考小区的参数来工作。无论是参考小区还是非参考小区,都配置为参考小区的小区号。比如:这里配置参考小区2,那么同PN下的2小区和3小区都是用2小区的参数工作。
8) 邻区配置:
邻区配置原则同3扇区站点,严格按照邻区配置规范进行操作。如1X使用同PN模式不需要再配置邻区。
注意,1X分裂前后小区对应关系: 分裂前0小区 ——分裂后 0、3同PN(0小区为参考小区,3小区为非参考小区,继承参考小区的参数、邻区);分裂前1小区 ——分裂后 1、4同PN(1小区为参考小区,4小区为非参考小区,继承参考小区的参数、邻区);分裂前2小区——分裂后 2、5同PN(2小区为参考小区,5小区为非参考小区,继承参考小区的参数、邻区)。可参考图 4。
9) 功率规划:
功率参数分裂前,温江区委党校基站1X 0、1载频均为20W;DO 6载频为20W,4、5载频为10W,共80W;分裂后,沿用分裂前的参数。其余参数也沿用分裂前的参数。
4 取得效果
6 扇区裂化工程施工完成以后,某城市网优中心6扇区裂化的网络效果评估工作,网络效果评估分为2部分:网络覆盖指标评估、网络KPI指标评估。
4.1 网络覆盖指标评估
需在扇区裂化前,提前完成相应网络覆盖质量数据采集及评估分析,待扇区改造完成后,开展数据对比评估分析,评估包括1X网络覆盖评估和DO网络覆盖评估2部分。
1) 1X网络质量评估:对比分析裂化前后的基站覆盖情况,Ec/Io、Rx、Tx等指标变化情况,并严格按照测试规范进行。
2) DO网络质量评估:对比分析扇区裂化前后的C/I、DRC申请速率、前向RLP速率等变化情况,并严格按照测试规范进行。
3) 用户投訴:裂化扇区前后要重点关注试点区域内用户投诉等情况,对比裂化后是否用户投诉量会增加。
4.2 关键KPI指标评估
提取裂化前与裂化后一周(或更长)关键数据KPI指标进行对比评估。KPI关键指标评估由2部分组成,1X KPI关键指标评估及DO KPI关键指标评估[3]。
1) 1X语音关键KPI指标评估
重点评估的1X KPI关键指标有如下:1X语音话务量、1X业务信道掉话率、1X语音呼叫建立成功率、语音软切换成功率、语音软切换比例等指标。
2) DO关键KPI指标评估
重点评估的DO KPI关键指标有如下:DO话务量、DO连接成功率、时隙占用率、DO掉线率、前向RLP吞吐量等指标。
5 总结推广
1) 通过3扇区分裂为6扇区,特别是在DO高话务热点忙小区,可以有效地降低DO时隙利用率,提高系统容量;采用6扇区分裂可以通过优化将网络覆盖方面的影响基本消除,同时可以优化提升网络指标;在1X话务量不高,而DO高话务热点区域,采用1X同PN的方式可以减少PN复用和邻区规划的困难及对现网带来的影响,同时可实现网络容量的提升。
2) 该案例适用场景:DO高话务密集性区域,如居民小区,且已无DO频点可用;区域内新增基站困难、如大学校园等区域。3扇区分裂为6扇区要根据小区覆盖的情况,如基站在用户区域的中心,切覆盖区域较为宽阔,可以适用;如果覆盖区域是狭长地带或者更软切换话务过高,则不宜裂化。如三个扇区的DO话务高,则可以将3扇区扩容到6扇区;若仅一个扇区的DO话务高,则可以单独裂化该扇区,将3扇区扩容为4扇区。
3) 劈裂天线可能存在较高的软切换、更软切换,后期的优化工作将相当重要。
6 工程中需要注意事项
1) 馈孔:如基站为C网新建工程,则均采用以下6洞18孔馈窗,改造前仅占用9个孔洞,完全能满足改造需求,如馈窗孔洞已使用完或无法满足改造要求,则需重新在原馈窗附近重新开馈孔新增馈窗。
2) 走线架:如基站为C网新建工程,则室、内外均采用400mm宽走线架布放馈线,室外馈线采用3排2列的三联卡固定馈线,有足够的空间可满足改造新增馈线的布放,如馈线过多已无法满足要求,则需新增走线架布放新增馈线。
3) 提前检查基站电源,确认配电柜是否支持6扇区,配电柜空开和熔丝是否满足要求;
4) 检查室外接地排是否能满足接驳要求,如地排孔洞无法满足改造需求 ,则需新增地排于原地排旁,且需用95铜芯线有效连接;
5) 塔桅:由于改造天线采用劈裂天线,该天线自重及风阻负荷均大于普通天线,塔桅均需视具体情况由铁塔设计单位现场查勘后出具改造设计方能进行实施。
附录:劈裂天线主要指标
新型“劈裂天线”是在一副天线罩实体中集成了两根双极化天线,采用波束赋形技术,生成两个窄波束扇区。
天线主要指标如下表:
劈裂天线水平方向图与普通33度天线水平方向图比较,如图10所示。
普通天线更换为劈裂天线后,如图11所示。
参考文献:
[1] 中国电信集团公司. 中国电信CDMA网络隐性问题专题优化指导书[Z]. 2010.
[2] 华为技术有限公司. CDMA系统RSSI异常分析指导书[Z].
[3] 盛骤, 谢式千, 潘承毅. 概率论与数理统计[M]. 3版.北京: 高等教育出版社, 2000.