皂河泵站是我国东线南水北调工程中的第六个梯级泵站,远景规划拟装6台套大型水泵电动机组,总抽水流量为600米~3/秒,第一期工程安装两台水泵电动机组.这是我国目前最大的水泵电动机组.关于泵站出水流道断流形式的选择,鉴于以往经验,采用了油压启闭的快速闸门断流.对这种大型泵站,采用快速闸门的关键是用什么控制方式,来适应机组操作的需要,亦即在机组启动时如何及时打开闸门;停机时闸门又能自动落
Zaohe Pumping Station is the sixth cascade pumping station in the project of South-to-North Water Diversion Project in the east of China. The long-term planning intends to install 6 sets of large-sized pump motor units with a total pumping flow of 600 m 3 / s. The first phase of the project will install two water pumps Motor group .This is the largest pump motor unit in our country.On the choice of pump station outlet runoff form, in view of past experience, the use of hydraulic opening and closing of the fast gate flow .For such a large pumping station, using fast The key is to use the gate control, to meet the needs of the operation of the unit, that is, when the unit starts in time to open the gate; shut down when the gate can automatically fall