宝钢设计确定的生产流程、技术装备,具有世界七十年代先进水平。主要表现在: 一、采用高产量、高效率的大型化设备。设有2座4063M~3高炉,年产铁650万吨;450M~2烧结机2台,年产烧结矿约1000万吨;大容积焦炉4组,年产焦炭335万吨;300吨氧气顶吹转炉3座,年产钢水670万吨;大型弧型板坯连铸机2台,年产板坯304万吨;1300方板坯初轧机,年轧制钢锭350万吨;1700热、冷连续轧板机,年产各为300万吨和100万吨;年产约40万吨的140连续式无缝钢管轧机;大型机械化原料码头,每年卸运量达200O万吨左右,其中包括大型门型悬臂式卸矿机,其小时能力达1800吨;大型综合料
Baosteel design to determine the production process, technology and equipment, with the world’s advanced level of the seventies. Mainly in: First, the use of high-volume, high-efficiency large-scale equipment. There are 2 4063M ~ 3 blast furnaces with an annual output of 6.5 million tons of iron; 2 sets of 450M ~ 2 sintering machines with an annual output of about 10 million tons of sinter; 4 sets of large capacity coke ovens with an annual output of 3.35 million tons of coke; 300 tons of oxygen Top blown converter 3, with an annual output of 6.7 million tons of molten steel; large arc slab caster 2, with an annual output of 3.04 million tons of slab; 1300 square slab mill, the annual steel ingot 3.5 million tons; 1700 hot, Cold continuous rolling mill, with an annual output of 3 million tons and 1 million tons; with an annual output of about 400,000 tons of 140 continuous seamless steel pipe mill; large mechanized raw material terminals, the annual discharge of 200 million tons, including Large gantry cantilever miner, its capacity of 1,800 tons of hours; large-scale integrated materials