穿金堤河倒虹吸基坑排水探析

来源 :中国水利 | 被引量 : 0次 | 上传用户:llw88636108
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
高堤口倒虹吸工程是鼓楼引黄入鲁灌溉工程中穿金堤河的一座重要建筑物,位于山东莘县高堤口村附近,全长297m,由进口闸室、三孔一联钢筋混凝土涵管和出口闸室组成。设计倒虹吸涵管底板高程38.7m,进口底板高程为46.03m,出口底板高程44.81m,进出口斜管坡度为1:4,基坑底部长度为202.24m,宽11m,设计基坑底高程为37.8m,净挖深达8m。 The high embankment inverted siphon project is an important building in the Drum Tower that leads into the Yellow River into the irrigation project in Jindi River. It is located near Gaodikouxincun, Shenxian County, Shandong Province, with a total length of 297m. It consists of an inlet sluice chamber, a three-hole reinforced concrete Culvert and outlet lock chamber. Design inverted siphon culvert floor elevation 38.7m, the import floor elevation of 46.03m, export floor elevation of 44.81m, import and export ramp slope of 1: 4, the bottom of the pit length of 202.24m, width 11m, design base elevation of 37.8 m, net dig depth of 8m.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
在建筑行业发展的背景下,各个城市的建筑物数量在不断地增加.为了确保人们生活的安全性和舒适性,需要避免建筑恶劣质量的产生,施工人员要加强建筑施工质量的管理和监督,始终
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
南北盘江红水河,由于1976年大化水电站的建设而断航沉寂了34年.在全国内河水运工作座谈会和2010年全国交通工作会议召开之际,欣闻西南水运出海中通道将试复航,这个全国30个自
济南银星纸业有限公司是生产薄页纸的老企业,打浆采用4台 φ 450mm双盘磨串联打浆,刀型(见图1)组合为4、4、4、4型(简称A型 )。原采用加拿大“凯利蒲”B1浆作为主要原料,为降低生
要有效保证建筑给排水设施在使用过程中,能够正常发展作用,就必须要确保其安装质量.建筑给排水系统的结构非常复杂,因此对管道安装技术提出极高的要求,一旦在管道安装过程中
问题初现:我国风电装备制造业过热发展rn2009年7月8日,工业和信息化部装备工业司司长张相木在第六届亚洲风能大会暨中国国际绿色能源论坛上说道:“广大的风电设备制造企业,还
针对蜗杆齿厚传统测量方法精度低或操作复杂的缺陷,提出了使用三坐标测量机精确、快速检测蜗杆齿厚的方法.在阐述该方法测量原理和测量步骤的基础上,用实例加以验证并对测量
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥