我队组建于1980年春,翌年即受省建委的委托,承包某市自来水公司开凿隧道工程。隧道穿过某医校教学大楼和一段冲积沟,穿越地段多数埋藏较浅,地形、地质条件复杂,施工难度大。该自来水管道扩建工程为某市重点工程之一,任务紧迫,在施工过程中,曾先后三次发生类似流砂浆状涌流性大塌方。涌水量较大,在施工期间有两处塌方点位于医校教学区。隧道两端掘进受阻,经长期处理,均难于凑效,工程被迫停工。省、市委领导同志,对解决该市人民生活用水问题极为重视,曾指出,如工程确实难于处理,可考虑改线绕道。我队领导根据实际困难,召开
Our team was established in the spring of 1980, commissioned by the Provincial Construction Commission the following year, contracting a city tap water company tunneling. Tunnel through a medical school teaching building and an alluvial ditch, most of the burial site shallow, topography, complex geological conditions, the construction of large. The water pipeline expansion project is one of the city’s major projects, the task is urgent, in the construction process, has occurred three times similar to flow-like flow inrush collapse. Large influx of water, during the construction of two collapse points in the medical school teaching area. Tunneling at both ends of the block, after long-term treatment, are difficult to make ends meet, the project was forced to suspend work. Provincial and municipal leading comrades attach great importance to solving the problem of water consumption for the people in the city and have pointed out that if the project is indeed difficult to handle, it may consider revising the route. My team leader according to the actual difficulties, held