塔机安放在建筑物中能增加自身的稳定,减少支撑,提高使用范围。但是结构到顶后,由于一般建筑物均有60~70m高,甚至更高,对内爬的大型施工机械的拆除带来了较大的困难。在上海市东方饭店施工中,我公司在局总工程师和建筑施工技术研究所有关同志的帮助下,针对内爬式塔机的拆除方式进行了探索,并通过施工实践,基本形成了一套完整独特的拆除方法,现简要介绍如下。一、概况东方饭店地处金陵东路外滩,由我公司
Tower cranes placed in buildings can increase their own stability, reduce support, and increase the scope of use. However, after the structure reaches the top, because the general buildings are all 60 to 70m high or even higher, the removal of the large-scale construction machinery inside the crawler has brought great difficulties. In the construction of Shanghai Dongfang Hotel, with the help of the chief engineer of the bureau and the relevant comrades of the Institute of Construction Technology, the company explored the method of demolition of the internal climbing tower crane, and through the construction practice, basically formed a complete set. The unique removal method is briefly described below. I. Overview Oriental Hotel is located on the Bund, Jinling East Road, by our company.