论文部分内容阅读
以S公司的装配生产车间为研究对象,通过综合运用工作研究及其相关的理论和方法来优化企业的生产装配流程,消除和减少不需要、不合理、不经济的工艺与流程.工作研究是改善企业生产作业流程,优化装配工艺操作,减少浪费,提高产品质量和资源利用率的工业工程改善重要手段.按照工位的作业特点,用工业工程方法重新分配作业,使作业内容的分配合理化,使得后桥制动角总成的总加工工序减少23%,周程时间节省33%,双手作业工序减少31%,标准作业时间减少17%,最终达到了提高企业生产率,降低成本,提高质量的目的.
Taking the assembly workshop of S Company as the research object, we optimize the production and assembly process of the enterprise through the comprehensive utilization of the work research and its related theories and methods to eliminate and reduce the unwanted, unreasonable and uneconomical processes and processes. Improve production processes, optimize assembly process operation, reduce waste, improve product quality and resource utilization of industrial engineering to improve an important means of work in accordance with the characteristics of the station, the use of industrial engineering methods to re-assign homework to rationalize the distribution of homework, The total processing procedure of the rear axle braking angle assembly is reduced by 23%, the time of the week processing is reduced by 33%, the number of working procedures by both hands is reduced by 31% and the standard operating time is reduced by 17%. Finally, the enterprise productivity, cost reduction and quality improvement purpose.