论文部分内容阅读
根据铁路总公司的要求,郑州铁路局全面负责山西中南部铁路通道重载综合试验期间的行车组织和安全管理工作,对试验安全工作负总责。牵头组织相关建设、测试、设计单位和设备厂家等根据(试验大纲)制定与试验相关的行车组织、安全管理、施工管理、设备维护、应急救援等规章制度,编制重载综合试验实施方案,做好重载列车编组、分解、装载等试验安排,组织机车车辆生产厂家加强行车设备的检查维护,确保重载列车处于良好技术状态,优质高效开展好试验工作。
According to the requirements of the railway head office, Zhengzhou Railway Bureau is fully responsible for the organization and safety management of driving organizations during the heavy-haul comprehensive test of the south-central Shanxi railway corridor and is responsible for the safety of the trial. Lead the organization-related construction, testing, design units and equipment manufacturers in accordance with (experimental outline) to develop and test-related driving organizations, safety management, construction management, equipment maintenance, emergency rescue and other rules and regulations, the preparation of comprehensive implementation of heavy load test program, do Good heavy train compilation, decomposition, loading and other experimental arrangements, organizations, locomotives and rolling stock manufacturers to strengthen inspection and maintenance of vehicles to ensure that heavy-haul trains in a good state of technology, good and efficient to carry out good experimental work.