论文部分内容阅读
一、前言由我院主编、几个主要部属设计院协编的《水利水电工程施工组织设计规范》即将颁发执行。规范编制历时5年,在此期间先后编制了《样稿》、《预审稿》、《初稿》、《送审稿》和《报批草稿》,每稿经集会讨论、专家咨询、修改补充,广泛吸取上级领导及国内同行专家的意见和建议,使规范在编制中能博采众长、集思广益,不断深化完善。
I. Preface By our editor, several major subordinate Institute of Design co-edited “Water Resources and Hydropower Engineering Construction Organization Design Code” is about to be issued. During the period of preparation, the “Standard Draft”, “Preliminary Review Draft”, “Preliminary Draft”, “Draft Review” and “Draft Approval Draft” have been drafted in this standard period. Each draft was discussed and approved by experts, consulted by experts, The opinions and suggestions of the superior leaders and domestic counterparts make it possible for the norm to draw upon all the leaders, brainstorming and deepen the improvement.