一、淮河流域“七五”期间前期工作的完成情况 1、规划工作:淮河流域修订规划报告的编制工作是“七五”期间水利部和淮委的重点项目。根据部、委的部署,应于1986年完成送审稿。但由于牵涉到战略性方案需深入补做工作及协调统一认识等方面的因素,该项工作被迫拖延了进度。《修订规划纲要》(送审稿)于去年6月底完成,《淮河流域修订规划报告》(送审稿)已修改三次于去年底完成。另有淮委主持的几个专题规划,如水土保持规划、水资源保护规划、水产规划、水力发电规划等均按期完成,有的专题规划报告已经专家会议审查,并定稿付印成册;由交通部航运设计院承担的航运规划已完成至1990年水平年规划,并已要求交通部门进行延长水平年的修改工作。跨省骨干支流河道的治理规划在有关省的配合下也已基本完成。除上述计划内的规划外,为解决沂沭泗洪水东调南下工程适应投资安排,先按20年一遇
I. Completion of Preliminary Work during the “Seventh Five-year Plan” Period in the Huaihe River Basin 1. Planning Work: The preparation of the report on the revision of the Huai River Basin is a key project of the Ministry of Water Conservancy and the Huai Committee during the “Seventh Five-Year Plan” period. According to the deployment of ministries and commissions, the draft for submission should be completed in 1986. However, due to factors such as the need to carry out in-depth remedial work and coordinate the reunification of strategic programs, the work was forced to delay the progress. The revised plan (draft for review) was completed by the end of June last year. The Huai River Basin Revised Planning Report (draft for review) has been revised three times and completed by the end of last year. In addition, several special programs such as water and soil conservation planning, water resources protection planning, aquatic planning and hydroelectric planning have all been completed on schedule. Some special planning reports have been reviewed by expert meetings and finalized and printed in volumes. The shipping plan undertaken by the Ministry of Shipping Design Institute has been completed to the level of the 1990 level year plan and has been requested by the transport sector to make changes to the extension year. Inter-provincial backbone tributaries of the river management plan in the province with the cooperation has been basically completed. In addition to the above plan within the planning, in order to solve the Yishu flood Eastward Transfer project to adapt to investment arrangements, according to a 20-year case