A Systemic Approach to Integrated E-maintenance of Large Engineering Plants

来源 :International Journal of Automation & Computing | 被引量 : 0次 | 上传用户:yuwenhuaji11987
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Large engineering plants (LEPs) have certain unique features that necessitate a maintenance strategy that is a combination of both time and condition based maintenance. Although this requirement is appreciated to varying degrees by asset owners, applied research leading to a systematic development of such a maintenance strategy is the need of the day. Such a strategy should also adopt a wholesome “systemic” approach so that the realization of the overall objectives of maintenance is maximized. E-maintenance has several potential benefits for large engineering plants. In this paper, a three pronged strategy is suggested for the successful implementation of e-maintenance for LEPs. Firstly, an integrated condition and time based maintenance framework is proposed for LEPs. Secondly, reference is drawn to models for condition and time based maintenance at systemic levels. As a part of the ab initio development of a condition monitoring system for a LEP, one of the characteristics of the condition monitoring system, namely, predictability, is discussed in detail as a sample for a systemic study. Thirdly, emphasis is laid on the information and expertise available in the domain of plant design, operation and maintenance and the same is tapped for incorporation in maintenance decision making. Large engineering plants (LEPs) have certain unique features that necessitate a maintenance strategy that is a combination of both time and condition based maintenance. Although this requirement is appreciated to vary degrees by asset owners, applied research leading to a systematic development of such a maintenance strategy is the need of the day. Such a strategy should also adopt a wholesome “systemic” approach so that the realization of the overall objectives of maintenance is maximized. E-maintenance has several potential benefits for large engineering plants. Firstly, an integrated condition and time based maintenance framework is proposed for LEPs. Secondly, reference is drawn to models for condition and time based maintenance at systemic levels. As a part of the ab initio development of a condition monitoring system for a LEP, one of the characteristics of the c ondition monitoring system, namely, predictability, is discussed in detail as a sample for a systemic study. Thirdly, emphasis is laid on the information and expertise available in the domain of plant design, operation and maintenance and the same is tapped for incorporation in maintenance decision making.
其他文献
冲孔灌注桩是一项复杂的隐蔽工程,其中需要众多的检验工序,各施工环节要求衔接紧密,本文根据工程实例,对冲孔灌注桩各施工环节加强过程控制.
建筑物后浇带施工必须根据设计、规范及工程具体实际情况,合理设置施工后浇带位置,并从模板支设、结构混凝土浇筑、后浇带垂直施工缝的处理、后浇带混凝土浇筑前的保护、后浇
计划经济条件下的劳动统计制度将越来越不适应市场经济发展变化的要求,这就要求我们对劳动统计制度进行完善和改革.劳动工资统计是国民经济统计的重要组成部分.本文主要对单
新保利大厦于2006年7月落成,与保利大厦隔桥相望,其功能主要由甲级写字楼、艺术博物馆、商业、餐饮等组成.为表达艺术博物馆的特点,建筑师将其布置在一个最为醒目的位置,设计
本文首先简要介绍了车用CNG技术,并以此为起点,对车用CNG技术的安全性作了较为全面地分析,最后提出相应的防范与事故处置措施.
建筑工程项目管理是一个复杂的过程,施工企业如何以建筑工程项目管理为中心,提高工程质量,保证进度,降低工程成本,提高经济效益,这是 事关建筑施工企业生存和发展的关键.
伴随着中国城市化进程的加快,住宅设计在现代建筑设计行业已经成为最日常主要工作之一.在日益标准程序化和标准产品化的住宅设计的同时,现代住宅设计的一些新思路已经逐步得
当前新农村建设在全国范围内如火如荼的进行,建设低碳型新农村,将成为一个新的课题.本文论述了如何将“低碳”运用到新农村建设当中.
本文分析了路面不平整产生的原因,并提出采取相应对策措施.
中医CAI课件中应用的计算机技术可归纳为多媒体技术、网络技术、超文本技术、仿真技术、人工智能技术5大类.介绍这5类计算机技术的内容、特点,在中医CAI软件中的应用现状和优