白山坪矿井在1997年秋季的两场暴雨中,因山洪暴发,河水猛涨,导致地表水沿着砾岩空洞长驱直入,造成井下涌水量突增(涌水量最高达2500m3/h),曾两度被淹,直接损失达1800多万元。为了彻底根治矿井水患威胁,白山坪矿采用了地面帷幕注浆法来阻断地面水向矿井溃入的通道,达到根治水患的目的。经多年来实践证明,帷幕注浆已取得很好的成果,达到预期目的。
During the two torrential rains in the Baishanping Mine in autumn 1997, flash floods caused the flash floods, resulting in the continuous flooding of surface water along the conglomerate hollows. As a result, the influx of underground water suddenly surged up to 2,500 m 3 / h, Submerged, a direct loss of more than 1800 million. In order to completely eradicate the threat of mine flooding, Baishanping Mine adopted a ground curtain grouting method to block the passage of surface water into the mine shaft and achieve the purpose of eliminating floods. After many years of practice, curtain grouting has achieved very good results, to achieve the desired purpose.