恒山特长隧道2011年2月27日在ZK88+907位置发生塌方,ZK88+854~ZK88+902段二次衬砌出现严重的超、侵限变形,二次衬砌侵入净空最大达25cm,仰拱出现开裂变形,衬砌整体移位且地表山坡拉张与剪切裂缝发育范围不断扩大,影响到隧道结构安全。主要对该隧道病害的特征、形成原因及综合处治方案进行了论述,经过监控量测表明,隧道已处于稳定状态,取得了良好的治理效果,为隧道病害治理提供了有效的参考依据。
Hengshan long tunnel on February 27, 2011 occurred at the location of ZK88 +907 landslides, ZK88 +854 ~ ZK88 +290 secondary lining serious ultra-invasion deformation, the second lining intrusion clearance up to 25cm, inverted arch cracking Deformation, the overall displacement of the lining and surface tension extension of the tension and shear cracks continue to expand, affecting the tunnel structure safety. The main characteristics of the tunnel disease, causes of formation and comprehensive treatment programs are discussed, after monitoring measurements show that the tunnel has been in a stable state, and achieved good governance effect, provided an effective reference for the tunnel disease control.