论文部分内容阅读
水电站机组管形座是厂房最重要的结构部位,其二期混凝土的施工质量直接关系到电站的安全运行,采取必要的技术措施确保其施工质量尤为重要。介绍“多掺”新技术在京南水电站机组管形座二期混凝土中的应用、采取相应的施工措施以及技术经济效果。
The tubular seat of hydropower station is the most important structural part of the plant. The construction quality of the second phase concrete is directly related to the safe operation of the power station. It is very important to take the necessary technical measures to ensure its construction quality. This paper introduces the application of “multi-doped” new technology in the second phase concrete of tubular seat of Beijing-Nanjing Hydropower Station, and adopts corresponding construction measures and technical and economic results.