论文部分内容阅读
2007年夏季在内蒙施工时,首次采用了双套震源交替扫描方式施工,生产效率大大超过预测。文章介绍了双震源施工的一些经验和心得。
In the summer of 2007, when the construction was carried out in Inner Mongolia, it was the first time to adopt double sets of seismic source alternate scanning construction methods, and the production efficiency greatly exceeded the forecast. The paper introduces some experiences and experiences in the construction of dual seismic sources.