作业时间对供电企业作业人员职业紧张水平影响

来源 :中国职业医学 | 被引量 : 0次 | 上传用户:qg101213
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
目的探讨供电企业作业人员作业时间对职业紧张水平的影响。方法采用整群抽样的方法选择广东省珠江三角洲、粤西地区各1家供电企业共804名员工作为研究对象,采用职业紧张量表(OSI-R)进行问卷调查,计算OSI-R的职业任务问卷(ORQ,包括任务过重、任务不适、任务模糊、任务冲突、责任感和工作环境6个子项目)、个体紧张反应问卷(PSQ,包括业务、心理、人际关系和躯体紧张反应4个子项目)、个体应对资源问卷(PRQ,包括娱乐休闲、自我保健、社会支持和理性处事4个子项目)总分和各个子项目得分,根据不同日平均工作时间、周工作天数、日使用电脑时间和户外工作时间分组进行统计分析。结果除任务模糊、娱乐休闲和社会支持子项目外,日平均工作时间>8 h组3个问卷总分和其余子项目得分均低于≤8 h组(P<0.05);除任务模糊、娱乐休闲、业务和人际关系子项目外,周工作时间>5 d组3个问卷总分和其余子项目得分均低于≤5 d组(P<0.05);不同日使用电脑时间组间ORQ、PSQ和PRQ总分两两比较,<2 h组与4 h~组,6 h~组与4 h~组的ORQ总分比较,差异均有统计学意义(P<0.05);<2 h组与其余4组、2 h~组分别与4 h~组、8 h~组的PSQ总分比较,差异均有统计学意义(P<0.05);其余各项总分的两两比较,差异均无统计学意义(P>0.05)。不同户外工作时间组间ORQ、PSQ和PRQ得分组间两两比较,差异均无统计学意义(P>0.05)。结论供电企业作业人员职业紧张水平受工作时间影响,适度避免超时作业,有利于缓解其职业紧张水平。 Objective To explore the influence of working hours of power supply enterprises on occupational stress level. Methods Using cluster sampling method, a total of 804 employees from one power supply enterprise in the Pearl River Delta of Guangdong Province and one power supply enterprise in the west of Guangdong Province were selected as the research objects. OSI-R was used for questionnaire survey to calculate the occupational tasks of OSI-R Questionnaire (ORQ, including 6 sub-tasks of overwork, discomfort of tasks, ambiguity of tasks, conflict of tasks, responsibility and work environment), individual stress response questionnaire (PSQ including 4 subprojects of business, psychological, interpersonal and somatic reactions) Individual responses to the resource questionnaire (PRQ, including 4 items of entertainment and leisure, self-care, social support and rational service) and individual sub-project scores were calculated according to different average daily working hours, working days per week, daily computer use hours and outdoor working hours Grouping for statistical analysis. Results In addition to fuzzy tasks, entertainment and social support sub-projects, the scores of the three questionnaires and the remaining sub-items in the average daily working hours of> 8 h were lower than those of ≤ 8 h (P <0.05) Leisure, business and interpersonal relationship, the scores of the three questionnaires and the remaining sub-items in weekdays> 5 days were lower than those in ≤5 days (P <0.05); ORQ, PSQ Compared with the total score of PRQ, ORQ scores of <2 h group and 4 h ~ 6 h ~ 4 h ~ group were significantly different (P <0.05); <2 h group and The other four groups, 2 h ~ group were 4 h ~ 8 h ~ group PSQ total score, the difference was statistically significant (P <0.05); the rest of the total score of any comparison, the difference was not Statistical significance (P> 0.05). There was no significant difference between ORQ, PSQ and PRQ score groups in different outdoor working hours (P> 0.05). Conclusion The level of occupational stress in power supply enterprises is affected by the working hours, and the overtime operation is moderately avoided, which helps to alleviate the occupational stress.
其他文献
期刊
5月15日,嘉和顶新、利优比招待晚宴在北京隆重举行,中国印刷技术协会和中国印刷及设备器材工业协会领导、利优比高层、嘉和顶新高层以及众多印刷企业代表齐聚一堂。  嘉和顶新总经理赵耀、日本利优比株式会社社长浦上浩、中国印刷及设备器材工业协会高级顾问谭俊峤分别发表了致辞,欢迎各界同仁莅临。随后,晚宴上播放了利优比集团的简介及其在China Print 2013上主推的产品利优比760E系列印刷机、利优比
期刊
PSP
5月15日,由中国印刷及设备器材工业协会、香港印刷业商会、台湾区印刷暨机器材料工业同业公会、澳门印刷业商会联合主办的“第四届中华印制大奖颁奖典礼”在北京隆重举行,来自政府机关、行业协会和参赛企业的代表共计300余人出席颁奖典礼,共同见证了这一精彩时刻。  第四届中华印制大奖在各省市印刷包装协会及众多支持单位的积极推动下,共征集了超过千余件参赛作品,经过来自香港、澳门特区及内地的近20多位资深专家的
金融创新是一个动态的过程,而传统的新古典经济学通常是以静态均衡分析方法对金融创新的原因,效应,结果进行研究。然而对金融创新的自适应性,创新过程中的环境选择等问题无法进行
改革开放以来我国加工贸易制造业在廉价的劳动力生产要素成本优势下迅猛发展,现已超过一般贸易成为我国最主要的贸易方式。加工贸易在拉动我国经济增长、解决剩余劳动力就业
学位
1 品种选择在黑龙江省栽培较多的品种是嫩荚豌豆、极早熟甜豌豆。2 育苗2.1 播种期荚用豌豆在保护地中的生育时期为早春,温室为1月中旬播种,2月下旬定植,4月采收上市,大棚生
China Print 2013上,MBO公司向业界隆重推出革命性新品——模块化折页设备M80。这款设备的进纸幅宽最大可达830mm,生产速度最高为230米/分钟,可高速完成大幅面生产。此外,M80配备了MBO最新的M1控制系统,可直接触屏操作,简单直观。其最大亮点是基于模块化设计理念,可以灵活实现各种组合:既可以组合成全栅栏式折页机,也可以重组成混合式折页机,这使客户购买的设备可以永不过时,只需