论文部分内容阅读
一、概况 (一) 研修的主要内容及过程: 中国铁道学会赴日本物理探矿株式会社研修组于1981年5月22日至11月17日在东京日本物理探矿株式会社研修半年,研修的主要内容和过程如下: 5月22日~5月31日一周:生活安排、熟习环境、参观公司各有关部门,如技术部、机械开发部、相模原试验场,图书资料等。 6月1日~6月26日四周:理论学习阶段、主要学习日本震探折射波法的解释理论和方法,如表层除去法,哈列斯法,交点法及复杂地形、地质条件下的解释方法等。学习方法起初是由日方指派专人给我们讲解介绍,通过一段学习,日方了解到我们都是在国内从事了多
I. Overview (A) The main content and process of training: China Railway Society went to Japan Physics Prospecting Co., Ltd. training group in Tokyo, Japan from May 22, 1981 to November 17 in Japan physical prospecting Co., training for six months, the main content of the training And the process is as follows: May 22 ~ May 31 week: living arrangements, familiar environment, visit the relevant departments of the company, such as the Ministry of Technology, Machinery Development Department, Sagamihara test site, books and materials. June 1 ~ June 26, four weeks: theoretical study phase, the main study of Japanese seismic reflection refraction wave theory and methods of interpretation, such as surface removal method, Harris method, intersection method and complex terrain, interpretation of geological conditions Method and so on. At first, the method of study was given by the Japanese side to give us a briefing on the introduction. After a period of study, the Japanese side learned that we all engaged more in our country