一、概况梅山铁厂有两座高炉,有效容积均为1060米~3,炉顶为双钟马基式布料器.设有14个风口,二个渣口,一个铁口.热风炉为内燃式,蓄热面积为66米~2/米~3,全部使用高炉煤气加热.炉料结构为烧结矿85%左右,配澳大利亚块矿约15%.1979年以来,生产条件相对稳定,但在客观条件暂时难以进一步改善的情况下,主要从加强管理、改善原燃料冶炼性能和改进技术操作着手,挖
First, the overview Meishan Iron Works has two blast furnaces, the effective volume is 1060 m ~ 3, the top of the bell for the two-horse-based distributor. Has 14 tuyeres, two slag mouth, one iron mouth. Type, thermal storage area of 66 m ~ 2 / m ~ 3, all using blast furnace gas heating. Burden structure for the sinter about 85%, with about 15% block ore in Australia. Since 1979, the production conditions are relatively stable, but objective Conditions are difficult to further improve the case, mainly from strengthening management, improve the performance of the original fuel and improve the technical operation of smelting, digging