论文部分内容阅读
建筑项目的施工期涉及基础开挖、场地平整、高压线拆迁、钢塔拆迁等工程,现场施工阶段是整个建筑项目中占据时间最长的阶段,它具有周期长、资源消耗较大且废弃物产生较多等特点。为了迎合当前全球提倡的节约能源、保护环境的号召,在建筑现场施工阶段对施工环境进行有效的管理对控制建筑工程带来的环境污染具有极其深远的意义。在本文中,笔者主要对建筑工程施工中的环境污染问题进行了深入分析。
The construction period of the construction project involves basic excavation, site preparation, high-voltage line demolition and relocation of steel towers. The on-site construction phase occupies the longest period in the whole construction project. It has the advantages of long cycle, large resource consumption and waste generation More features. In order to cater to the current global call for energy conservation and environmental protection, effective management of the construction environment at the construction site construction phase has extremely far-reaching significance in controlling environmental pollution brought by construction projects. In this paper, I mainly conducted an in-depth analysis of the environmental pollution in the construction of construction projects.