统配煤矿自1985年实行投入产出总承包以来,产量水平与管理水平有了很大提高,企业有了活力,并取得了明显的经济效果。但也应该看到,由于承包指标不合理,有许多煤矿把主要用于发展生产的超产煤加价收入抵补了亏损,甚至有的还动用维简基金弥补亏损;煤炭基建投资拖欠,滞缓了施工进度与投产规模,使煤炭生产后劲严重不足,企业没有自我改造和自我发展的能力。因此,为使煤炭工业为我国经济的整体发展提供足够的动力,更好地发挥承包经营责任制的效用,必须科学合理地确定新一轮的承包基数。现行承包基数多采用基期分析测算法,即以企业上期(年)有关技术经济指标的实际数,乘以其
Since the implementation of the general contracting of output and input of the coal mines in 1985, the output level and management level have been greatly improved. The enterprises have gained vitality and achieved obvious economic results. However, it should also be noted that due to the unreasonable contracting indicators, many mines have made up for the deficit with the increase in excess coal production, which is mainly used for development and production, and even some have used the fund to make up for the losses. Inadequate investment in coal infrastructure delayed the construction The scale of progress and production put the coal production stamina seriously underdeveloped and enterprises lack the capability of self-renovation and self-development. Therefore, in order for the coal industry to provide sufficient impetus for the overall economic development of our country and give full play to the utility of the responsibility system of contracting management, a new round of contractual bases must be scientifically and reasonably determined. The current contract base to use more base analysis method, that is, the previous period (year) technical and economic indicators of the actual number, multiplied by