论文部分内容阅读
在“八·五”计划实施第二年开始之际,第六届隧道和地下工程科技动态报告会于1992年4月14日~17日在成都召开。这次报告会的中心内容是回顾与展望我国隧道工程技术的进步与发展。同时对“八五”新线的隧道工程、一些有特点的工程实例和世界铁路隧道的发展作了介绍。还邀请引大入秦(指甘肃省的一项水利工程)工程的意大利专家和中国专家介绍了TBM掘进水工隧洞的施工经验。与会代表对共同关心的问题展开了热烈讨论。这些问题主要有:1.新奥法实施中的成
At the beginning of the second year of the “August 5” Plan, the sixth technical conference on tunneling and underground engineering science and technology was held in Chengdu from April 14 to April 17, 1992. The center of this report is to review and forecast the progress and development of tunnel engineering in our country. At the same time, it introduced the tunnel construction of the “Eighth Five-Year” new route, some characteristic engineering examples and the development of the world’s railway tunnels. Italian experts and experts from China who invited Daqinqin (a water conservancy project in Gansu Province) were also invited to introduce the construction experience of tunneling TBM tunnel. Participants warmly discussed the issues of common concern. These problems are: 1. The implementation of the new Austrian law into