论文部分内容阅读
为了防止大电网与大机组在某环节发生故障,并由此而引发事故的扩大,指出了制造方面应保证大机组的技术条件。同时提出了大型机组在工程设计和生产运行方面应考虑的问题。
In order to prevent a large power grid and large units in a part of the failure, and thus lead to the expansion of the accident, pointed out that manufacturing should ensure that the technical conditions of large units. At the same time, the problems that should be considered in the engineering design and production operation of large units are put forward.