摘要:随着现代社会的不断发展,由于轻型钢结构厂房具有总体质量轻、造价低、施工周期短、安全可靠、节省基础、造型美观、结构稳定及环保节能等优势得到了很广泛的应用,近年来,轻型钢结构工程在建筑工程的应用及普及增速较快,而影响轻型钢结构应用,影响工程造价的有价格范围、价差、防火涂层等因素。应加大人工成本和机械成本的预测和控制,提高标准设计意识,推行限额设计,控制设计变更,功能细化、简化,重点控制造价高的功能。本文就此做出了深入的论述,可供同行参考借鉴。
关键词:轻钢工程; 影响因素; 造价控制;
Abstract: with the development of modern society, because light steel structure plant has the overall light quality, low cost, short construction period, safe and reliable, save basis, beautiful modelling, the structure stability and environmental protection and energy saving, etc advantages are very wide application, in recent years, light steel structure project in the construction engineering application and popularization of rapid growth, and the influence of light steel structure application, the influence of engineering cost price range, a price, fire prevention coating, and other factors. Should strengthen labor costs and the prediction and control of the mechanical cost, raise the standard design consciousness, promote the quota design, control the change of the design, the function is thinning and simplified, and the function of the key control cost is high. This paper made it a deep discusses, available for peer for reference.
Keywords: light steel engineering; Influencing factors; Cost control;
• 中圖分类号:TU723.3文献标识码:A 文章编号:
前言
随着我国经济建设的迅速发展, 轻型钢结构以其用钢量低、重量轻、造价低、适用范围广等优点而获得广泛应用。钢结构工程中使用量最多的就是钢材,随着市场经济的不断完善,钢材的价格也随着市场供需关系的变化而改变,所以在钢结构工程的投标报价中难免存在风险和损失。
一、钢结构在工程中的影响问题分析
1、价格范围的影响。应对国家的政策观点和近几年的钢材价格波动情况进行分析,如遇到国家政策性调整、铁矿石供应关系变化等都会导致价格的浮动。同时要对大型钢材生产厂家进行评估和询价,确定在投标报价时钢材准确的价格范围,进行主材的调差,以避免在后期的钢结构制作和安装过程中出现钢材价格上涨,导致工程亏损。
2、价差的影响。根据地方政策的不同,政府都会对钢材销售商有一定的规范或规定,抑制钢材价格的波动,以控制整体钢材市场的稳定,这样在采购时可以根据最新市场价进行购买。但如果一个钢结构工程中标后,建设方和施工方拟订合同时是施工方设计施工总承包,建设方只提供整个工程的总概算,且建设方提供的图纸还没最终确认,这就造成施工方在做工程准备时,全部钢材的采购不可能一次性购进,因为施工方无法确认最终使用的钢材的型号和规格。如果该工程在签订工程合同时没与建设方约定材料调差或约定材料调差但具体金额幅度较小时,后期出现钢材价格上涨幅度较大,直接造成工程利润减少,这就要求在投标报价中特别注意价差的调整和把握对钢材价格趋势的准确预计。
3、防火涂层的影响。钢结构的防腐防火涂料的涂刷方面也是关键,会直接影响后期的质量和美观问题,从而直接影响工程总造价。一般在钢结构工程设计的技术说明上都会标注两者的做法,但在实际做法中是有着严格的质量要求的:一是涂层要求 。防腐涂料、稀释料和固化剂的品种、规格、性能符合产品标准和设计要求,要检查产品质量合格文件、中文标志和检验报告。二是涂装基层。涂装前钢材表面除锈应符合设计要求和有关标准的规定,除锈处理后的钢材表面不应有焊渣、焊疤、灰尘、油污、水和毛刺等。三是涂层厚度。涂料、涂装遍数、涂层厚度均应符合设计要求。只有同时把握好防腐防火涂料的涂刷,才能有效控制工程造价。
二、钢结构的设计阶段造价管理问题分析
工业厂房建筑是集经济、技术与管理为一体综合实体,工程造价的高低,直接影响着国家投资建厂效益的好坏。它的造价控制不仅仅关系到经济利益,还联系到当地的民生问题,比如提供当地就业机会、增加当地税收等等。对一个厂房建筑造价而言,工程设计阶段是控制工程造价最初阶段,也是关键的环节。工程设计,是指在设计任务书批准后,按照国家规定的步骤、规模要求和内容进行设计。设计阶段对工程项目投资起着决定性的作用。
1、提高标准设计意识,推广标准设计。工程建设标准和规范设计来源于工程建设的实践经验和科研成果,是工程建设必须遵循的科学依据。推广标准设计有利于较大幅度降低工程造价,节约设计费用,大大加快提供设计图纸的速度,缩短设计周期。构件预制厂生产的标准件能使工艺定型,容易提高工人技术,提高劳动生产率及统一配件、节约材料,有利于降低构配件成本。
2、推行限额设计。限额设计是控制工程造价的主要手段,所谓限额设计就是按标准的投资估算控制初步设计,按标准的初步设计总概算控制施工图设计,即将上阶段审定的投资额作为下一设计阶段投资控制的总体目标。在设计中各专业在保证达到使用功能的前提下,按分配的投资限额控制设计,以控制工程量为主要内容,严格控制不合理变更,保证总投资额不突破,克服“三超”,使设计与概预算形成有机的整体,克服相互脱节现象。在设计过程中要本着尊重科学、实事求是的态度,加强技术与经济的对立统一,强化设计人员的工程造价意识,树立设计人员高度的责任感,通过对设计方案、设备选型、参数匹配、效益分析等方面进行最优化的设计控制,真正使限额设计落到实处。
3、控制设计变更。设计单位认真做好图纸的审查工作,可以减少图纸中的错漏现象,使设计阶段的施工图预算更为准确。图纸本身不完善或设计深度不够,将导致在施工阶段的设计变更增加,从而导致工程造价增加。设计单位要提高设计深度,完善设计图纸应注意:在设计阶段确定建筑的最终方案,避免在施工阶段提出更改;加强设计的前期准备工作,如勘察、钻探等;选择合适的设计单位,合理的设计费用;对因设计单位的原因造成设计变更而产生的投资失控,明确其应承担的责任。
4、功能细化、简化,重点控制造价高的功能价值工程是通过对产品的功能分析,使之以较低的总成本,可靠地实现产品的必要功能,从而提高产品价值的一套科学的技术经济方法。它是处理工程造价和功能矛盾的一种现代方法,运用这种方法就可以通过功能细化,把多余的功能去掉,对造价高的功能实施重点控制,从而最终降低工程造价,实现建设项目经济效益、社会效益和环境效益的最佳结合。
第3项措施是在一个完善的钢结构工程,设计变更是在所难免的,在施工过程中是最容易发现某个部位的不合理而导致下道工序无法进行,这时设计变更是设计单位必须做好的一项重要工作,因为这是后期进行工程结算的依据,是要进入总造价的。所以在出现设计变更时就应该确定最终方案,避免再次施工时出现更改。同时设计单位在设计变更时应加强设计的精准,并且设计资料齐全,调动设计人员的积极性,从而避免设计变更产生的同时,投资失控。
三、钢结构工程中人工和機械的成本管理问题分析
1、人工成本控制。在钢结构部件的制作中,人工费是根据市场价格和本企业内部人员的实际的工资标准进行预测和控制的,对不同的工种和对应的设备配置来决定人工工资。另外在定额中人工费是指:应列入计价表的直接从事建筑与装饰工程施工工人和附属辅助生产单位工人的基本工资、工资性津贴、流动施工津贴、房租津贴、职工福利费、劳动保护费。并且企业单位一般都会有自己的企业定额,它是根据最实际的人工工日单价标准进行套定额,然后根据地方政策对定额内的人工进行调整,这样在钢结构工程的投标报价中占了一定的优势,因为只有按照市场价格进行的人工费的预测和控制才是最合理的。
2、机械成本控制。机械费在定额中指应列入计价表的施工机械台班消耗量按相应的施工机械台班单价计算的建筑与装饰工程施工机械使用费以及机械安、拆和进退场费。特别是在钢构件的制作和安装中,机械费用是不可缺少的一项费用,特别是对大型的钢构件进行喷砂除锈时,大功率电的消耗和机械的使用损耗都是直接关系到成本的大小,这样就需要分析自有的机械设备的摊销费用和使用费用,并于使用租赁机械设备费用相比较。当使用租赁机械设备更划算时,应将租赁作为机械使用费的主要标准。而大型施工企业自身拥有较全的机械设备,当其在使用设备过程中就已经很清楚费用的大小,包括机械的维护都应在摊销费用里,这样就比较好控制工程造价。
四、结语
工程造价管理是工业厂房建设的重要内容,它具有管理过程长,市场材料、设备价格随时发生变化的特点,导致工程造价复杂多变。只有严格规范每个阶段的工程造价管理,才能使厂房建设既达到工程质量优良,又使工程造价在科学合理的范围内。
参考文献:
[1]杨红雄,柯洪.工程造价计价与控制[M].北京:中国计划出版社出版,2008.
[2]徐蓉.工程造价管理[M].上海:同济大学出版社,2005.
注:文章内所有公式及图表请用PDF形式查看。
关键词:轻钢工程; 影响因素; 造价控制;
Abstract: with the development of modern society, because light steel structure plant has the overall light quality, low cost, short construction period, safe and reliable, save basis, beautiful modelling, the structure stability and environmental protection and energy saving, etc advantages are very wide application, in recent years, light steel structure project in the construction engineering application and popularization of rapid growth, and the influence of light steel structure application, the influence of engineering cost price range, a price, fire prevention coating, and other factors. Should strengthen labor costs and the prediction and control of the mechanical cost, raise the standard design consciousness, promote the quota design, control the change of the design, the function is thinning and simplified, and the function of the key control cost is high. This paper made it a deep discusses, available for peer for reference.
Keywords: light steel engineering; Influencing factors; Cost control;
• 中圖分类号:TU723.3文献标识码:A 文章编号:
前言
随着我国经济建设的迅速发展, 轻型钢结构以其用钢量低、重量轻、造价低、适用范围广等优点而获得广泛应用。钢结构工程中使用量最多的就是钢材,随着市场经济的不断完善,钢材的价格也随着市场供需关系的变化而改变,所以在钢结构工程的投标报价中难免存在风险和损失。
一、钢结构在工程中的影响问题分析
1、价格范围的影响。应对国家的政策观点和近几年的钢材价格波动情况进行分析,如遇到国家政策性调整、铁矿石供应关系变化等都会导致价格的浮动。同时要对大型钢材生产厂家进行评估和询价,确定在投标报价时钢材准确的价格范围,进行主材的调差,以避免在后期的钢结构制作和安装过程中出现钢材价格上涨,导致工程亏损。
2、价差的影响。根据地方政策的不同,政府都会对钢材销售商有一定的规范或规定,抑制钢材价格的波动,以控制整体钢材市场的稳定,这样在采购时可以根据最新市场价进行购买。但如果一个钢结构工程中标后,建设方和施工方拟订合同时是施工方设计施工总承包,建设方只提供整个工程的总概算,且建设方提供的图纸还没最终确认,这就造成施工方在做工程准备时,全部钢材的采购不可能一次性购进,因为施工方无法确认最终使用的钢材的型号和规格。如果该工程在签订工程合同时没与建设方约定材料调差或约定材料调差但具体金额幅度较小时,后期出现钢材价格上涨幅度较大,直接造成工程利润减少,这就要求在投标报价中特别注意价差的调整和把握对钢材价格趋势的准确预计。
3、防火涂层的影响。钢结构的防腐防火涂料的涂刷方面也是关键,会直接影响后期的质量和美观问题,从而直接影响工程总造价。一般在钢结构工程设计的技术说明上都会标注两者的做法,但在实际做法中是有着严格的质量要求的:一是涂层要求 。防腐涂料、稀释料和固化剂的品种、规格、性能符合产品标准和设计要求,要检查产品质量合格文件、中文标志和检验报告。二是涂装基层。涂装前钢材表面除锈应符合设计要求和有关标准的规定,除锈处理后的钢材表面不应有焊渣、焊疤、灰尘、油污、水和毛刺等。三是涂层厚度。涂料、涂装遍数、涂层厚度均应符合设计要求。只有同时把握好防腐防火涂料的涂刷,才能有效控制工程造价。
二、钢结构的设计阶段造价管理问题分析
工业厂房建筑是集经济、技术与管理为一体综合实体,工程造价的高低,直接影响着国家投资建厂效益的好坏。它的造价控制不仅仅关系到经济利益,还联系到当地的民生问题,比如提供当地就业机会、增加当地税收等等。对一个厂房建筑造价而言,工程设计阶段是控制工程造价最初阶段,也是关键的环节。工程设计,是指在设计任务书批准后,按照国家规定的步骤、规模要求和内容进行设计。设计阶段对工程项目投资起着决定性的作用。
1、提高标准设计意识,推广标准设计。工程建设标准和规范设计来源于工程建设的实践经验和科研成果,是工程建设必须遵循的科学依据。推广标准设计有利于较大幅度降低工程造价,节约设计费用,大大加快提供设计图纸的速度,缩短设计周期。构件预制厂生产的标准件能使工艺定型,容易提高工人技术,提高劳动生产率及统一配件、节约材料,有利于降低构配件成本。
2、推行限额设计。限额设计是控制工程造价的主要手段,所谓限额设计就是按标准的投资估算控制初步设计,按标准的初步设计总概算控制施工图设计,即将上阶段审定的投资额作为下一设计阶段投资控制的总体目标。在设计中各专业在保证达到使用功能的前提下,按分配的投资限额控制设计,以控制工程量为主要内容,严格控制不合理变更,保证总投资额不突破,克服“三超”,使设计与概预算形成有机的整体,克服相互脱节现象。在设计过程中要本着尊重科学、实事求是的态度,加强技术与经济的对立统一,强化设计人员的工程造价意识,树立设计人员高度的责任感,通过对设计方案、设备选型、参数匹配、效益分析等方面进行最优化的设计控制,真正使限额设计落到实处。
3、控制设计变更。设计单位认真做好图纸的审查工作,可以减少图纸中的错漏现象,使设计阶段的施工图预算更为准确。图纸本身不完善或设计深度不够,将导致在施工阶段的设计变更增加,从而导致工程造价增加。设计单位要提高设计深度,完善设计图纸应注意:在设计阶段确定建筑的最终方案,避免在施工阶段提出更改;加强设计的前期准备工作,如勘察、钻探等;选择合适的设计单位,合理的设计费用;对因设计单位的原因造成设计变更而产生的投资失控,明确其应承担的责任。
4、功能细化、简化,重点控制造价高的功能价值工程是通过对产品的功能分析,使之以较低的总成本,可靠地实现产品的必要功能,从而提高产品价值的一套科学的技术经济方法。它是处理工程造价和功能矛盾的一种现代方法,运用这种方法就可以通过功能细化,把多余的功能去掉,对造价高的功能实施重点控制,从而最终降低工程造价,实现建设项目经济效益、社会效益和环境效益的最佳结合。
第3项措施是在一个完善的钢结构工程,设计变更是在所难免的,在施工过程中是最容易发现某个部位的不合理而导致下道工序无法进行,这时设计变更是设计单位必须做好的一项重要工作,因为这是后期进行工程结算的依据,是要进入总造价的。所以在出现设计变更时就应该确定最终方案,避免再次施工时出现更改。同时设计单位在设计变更时应加强设计的精准,并且设计资料齐全,调动设计人员的积极性,从而避免设计变更产生的同时,投资失控。
三、钢结构工程中人工和機械的成本管理问题分析
1、人工成本控制。在钢结构部件的制作中,人工费是根据市场价格和本企业内部人员的实际的工资标准进行预测和控制的,对不同的工种和对应的设备配置来决定人工工资。另外在定额中人工费是指:应列入计价表的直接从事建筑与装饰工程施工工人和附属辅助生产单位工人的基本工资、工资性津贴、流动施工津贴、房租津贴、职工福利费、劳动保护费。并且企业单位一般都会有自己的企业定额,它是根据最实际的人工工日单价标准进行套定额,然后根据地方政策对定额内的人工进行调整,这样在钢结构工程的投标报价中占了一定的优势,因为只有按照市场价格进行的人工费的预测和控制才是最合理的。
2、机械成本控制。机械费在定额中指应列入计价表的施工机械台班消耗量按相应的施工机械台班单价计算的建筑与装饰工程施工机械使用费以及机械安、拆和进退场费。特别是在钢构件的制作和安装中,机械费用是不可缺少的一项费用,特别是对大型的钢构件进行喷砂除锈时,大功率电的消耗和机械的使用损耗都是直接关系到成本的大小,这样就需要分析自有的机械设备的摊销费用和使用费用,并于使用租赁机械设备费用相比较。当使用租赁机械设备更划算时,应将租赁作为机械使用费的主要标准。而大型施工企业自身拥有较全的机械设备,当其在使用设备过程中就已经很清楚费用的大小,包括机械的维护都应在摊销费用里,这样就比较好控制工程造价。
四、结语
工程造价管理是工业厂房建设的重要内容,它具有管理过程长,市场材料、设备价格随时发生变化的特点,导致工程造价复杂多变。只有严格规范每个阶段的工程造价管理,才能使厂房建设既达到工程质量优良,又使工程造价在科学合理的范围内。