论文部分内容阅读
江西丰城县水电局利用药湖电排站的六台同步电动机作调相运行,可向南新电网发送电感性无功电力,以1度有功电度,发10度无功电度,去补偿电感性负载需要的优越条件。经过不到两年的改造,于1983年9月20日,正式开始发电了。据5台机组(1台备用)30天发电统计,共发无功电1262781度,按每度0.013元计算。折合人民币16416元,除去消耗有功电126278度,每度按0.055元计算,
The Fengcheng County Hydropower Bureau in Jiangxi Province uses the six synchronous motors of the Yaohu Pumping Station for phase modulation operation. It can send inductive reactive power to the South New Power Grid, with 1 degree of active power and 10 degrees of reactive power. Compensation for inductive loads requires superior conditions. After less than two years of transformation, on September 20, 1983, power generation officially began. According to the 30-day power generation statistics of 5 units (1 stand-by), a total of 1262781 degrees of reactive power was generated, which was calculated at 0.013 yuan per degree. Equivalent to 16,416 yuan, excluding consumption of 126,278 degrees of active power, calculated at 0.055 yuan per degree,