1 前言 1993年阿辛达二炼钢厂接受了挑战,即通过提高连铸速度提高两座连铸机其中一座的生产能力。报告介绍了达到这个目标的各项步骤。首先分析了提高连铸速度的各可变因素。接着说明了对设备和操作进行的必要改造。
1 INTRODUCTION The 1993 Auxinda steelworks was challenged to increase the production capacity of one of two caster machines by increasing the rate of continuous casting. The report describes the steps to achieve this goal. First of all, analyze the various factors to improve the casting speed. Next, the necessary modifications to the equipment and operation are described.