Verification for Flow Simulation in a LBE Fast Reactor Fuel Assembly

来源 :中国科学院近代物理研究所和兰州重离子研究装置年报:英文版 | 被引量 : 0次 | 上传用户:ergezhi
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The fast reactor fuel assembly employs wire wraps as spacers,which could enhance the crossflow between the pins.It is necessary to accurately predict the fluid flow between rod bundles in the thermal hydraulic analysis of reactors.
其他文献
In 2019,the HIRFL facility has operated for 7392 h,including 586.5 h for the machine preparation,830 h for the machine commissioning due to beam change,208.5 h
The turbulent Prandtl nuqmber Prt of low Prandtl number Pr fluid is a nonlinear parameter characterized by Prt=f(Re,Pr,y),which is related to Reynolds number Re
采用循环伏安及动电位极化方法研究黄铜矿在甘氨酸介质中的浸出反应机理及动力学。使用黄铜精矿−碳糊电极研究pH值(9~12),温度(30~90)及甘氨酸浓度(0~2 mol/L)对腐蚀电流密
为了研究铷(Rb)元素对CaO−SiO2−Na2O−B2O3−MgO−ZnO−P2O5系生物玻璃陶瓷的相组成、显微结构、力学性能和细胞响应的影响,设计加铷和不加铷的玻璃陶瓷成分。结果表明,在
Based on the four equation turbulent heat transfer model k-ε-kθ-εθ,the unknown term of Reynolds heat flux in the energy equation is considered to be solved
目的:观察经颅多普勒超声(TCD)对脑梗死早期患者大血管病变的诊断价值。方法:选取脑梗死早期患者92例,随机分为两组,各46例。A组应用核磁共振弥散成像(DWI)检查;B组应用TCD检
The construction of the SSC-Linac has made significant progress in 2019.The first beam commissioning of SSC-Linac as an injector of the Separated Sector Cyclotr
期刊
目的:探讨单孔腹腔镜治疗卵巢囊肿的围手术期护理模式及实施效果。方法:2019年5月-2020年5月收治行单孔腹腔镜手术治疗的卵巢囊肿患者92例,随机分为两组,各46例。对照组给予
目的:观察扶正消萎汤治疗脾胃虚弱型慢性萎缩性胃炎的效果。方法:2018年2月-2020年6月收治脾胃虚弱型慢性萎缩性胃炎患者90例,按照治疗方法不同分为两组,各45例。对照组给予
In 2019,the service time of the two on-line ion sources,LECR3 and SECRAL,is 3642.5 and 3617 h respectively,amounting to 7259.5 h.There are 19 kinds of ion beams