康山水库现状防洪能力分析

来源 :河南水利 | 被引量 : 0次 | 上传用户:chengxuyuanx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1洪水分析由于康山水库实测流量资料短缺,水文复核采用《河南省中小流域设计暴雨洪水图集》(1984年出版,以下简称“84图集”)提供数值进行计算。设计暴雨由“84图集”提供雨量进行计算,由于水库流域面积19km~2,小于50km~2,面雨量采用点雨量,水文分区属Ⅱ区,设计面雨量计算按理论频率计算公式Htp= Ht·Kp,偏差系数Cs=3.5Cv,Kp由雨量变差系数查P—Ⅲ曲线Kp值表求得,24小时设计净雨由山丘区次降雨径流关系P+Pa~R 1 Flood Analysis Due to the shortage of measured flow data in Kangshan Reservoir, hydrological review was conducted using numerical values ​​provided in “Atlas of Design of Rainstorms and Floods in Medium and Small Watersheds of Henan Province” (1984, hereinafter referred to as “84 Atlas”). Design rainfall is calculated by “84 Atlas” rainfall. Since the reservoir drainage area is 19km ~ 2 and less than 50km ~ 2, the surface rainfall is point rainfall, and the hydrological subzone is in area Ⅱ. The design surface rainfall is calculated according to the theoretical frequency formula Htp = Ht · Kp, the coefficient of variation Cs = 3.5Cv, Kp is obtained from the K-value table of P-Ⅲ curve by the coefficient of variation of rainfall, and the 24-hour design net rainfall is calculated from the rainfall runoff P + Pa ~ R
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1节水灌溉首先要充分利用当地水资源首先,充分利用降水是节水灌溉的首要措施。利用降水是农作物生长用水的基础,灌溉是补充降水的不足。利用天气预报、墒情预报和蓄积降水的
通过对浙江省国有森林资源资产产权变动的全面调查,摸清了全省产权变动的定价现状,分析了定价中存在的主要问题,并提出了解决定价中存在问题的具体措施.
介绍了常用防腐蚀涂料的干燥固化机理,表面处理要求,施工性能等方面的内容,可以帮助涂装检查员在现场施工中有效地控制常用防腐蚀涂料的施工质量.
输水洞工程是一种常见的工程形式,在施工中应通过运用科学的方法,有效的控制手段,及时发现施工中的异常现象并采取措施加以调整,防止质量不合格产品的出现,以确保工程质量。
在HSE法律法规日益完善和国家安全环保监管力度不断加大的背景下,当前我国企业的合规性管理有了明显进步,但由于不同企业管理水平的差异和缺乏合规性管理经验、监管又不可能
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1发挥科技创新的基础作用水利工程的安全和耐久性问题覆盖了工程的规划、设计、建设、养护、运营管理的全过程。涉及到建设标准,计算理论,材料科学,施工艺术,机械设备等全面
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
国务院办公厅于2002年9月17日以国办发[2002]45号文发布了《水利工程管理体制改革实施意见》(以下简称《实施意贝》),拉开了水利工程管理体制改革的序幕。2004年12月7日,河南