Stability and guaranteed cost control for uncertain time-delay Lur'e systems

来源 :系统工程与电子技术(英文版) | 被引量 : 0次 | 上传用户:yyy_chj
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The problem of delay-dependent stability and guaranteed cost control (GCC) for a class of uncertain time-delay Lure systems are studied. By using an improved integral inequality, a less conservative delay-dependent stability criterion is formulated as the feasibility problem of the linear matrix inequality (LMI). The criterion is proved theoretically to be less conservative than some existing results for linear time-delay systems. Because of the fact that the matrices in the LMI-based stability criteria usually have different dimensions, different structures, and different variables, the conservatism analysis of the criteria is difficult. This study brings about a new insight into the comparison of conservatism among different stability criteria, which are expressed in certain LMI forms. The existence of the guaranteed cost controller is given in terms of matrix inequalities. The condition can be solved by using an iterative procedure and does not need any parameter tuning. A numerical example is given to illustrate the effectiveness of the proposed method.
其他文献
物资管理主要指的是对本企业在生产过程中需要的物资的购买及使用情况进行计划、组织、控制的过程。我国的企业物资管理最早应用是在计划经济时期,随着经济的发展,物资管理对
企业要想在激烈的市场竞争中立于不败之地,那就必须要加强其人才队伍的建设,充分发挥人力资源的优势和作用。对企业员工进行培训可以有效的开发员工的潜能,充分发挥其能力。
The alloy 5052 was welded by friction stir welding (FSW) and tungsten inert gas (TIG) welding. The effect of welding processes (FSW and TIG) on the fatigue prop
By applying the variational inequality technique,we analyzed the behavior of the exercise boundary of the American-style interest rate option under the assumpti
Owing to the absence of metal binder, binderless cemented carbides have higher wear, corrosion, and oxidation resistance. WC-0.3VC-0.5Cr3C2 powders with an aver
A numerical iterative model was derived from the difference method and a perturbation assumption to calculate the coefficient function of a wave equation.The me
为了了解淋巴细胞功能相关抗原1(lymphocyte function-associated antigen 1,LFA-1)和极迟反应抗原4(very late antigen 4,VLA-4)在高增殖潜能内皮祖细胞(high proliferative
To study the uncertain optimization problems on implementation schedule, time-cost trade-off and quality in enterprise resource planning (ERP) implementation, c
On the basis of the analysis of solidification interval and temperature distribution of components manufactured by the squeeze casting method, formulas for calc
To eliminate the aliasing that appeared during the measurement of multi-components nonstationary signals, a novel kind of anti-aliasing algorithm based on the s