论文部分内容阅读
以嘉华嘉陵江大桥墩身施工为例,通过采用无支架塔吊翻模技术的应用,经济、安全的解决了桥梁高墩的施工,经工程实践,效果良好。
Taking the construction of Jiahua Jialing River Bridge pier as an example, the construction of high pier of bridge is solved economically and safely by adopting the technology of unsteady tower crane turning over mold. The engineering practice has achieved good results.