Analytical investigations of seismic responses for reinforced concrete bridge columns subjected to s

来源 :Earthquake Engineering and Engineering Vibration | 被引量 : 0次 | 上传用户:reap
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Strong near-fault ground motion, usually caused by the fault-rupture and characterized by a pulse-like velocity- wave form, often causes dramatic instantaneous seismic energy (Jadhav and Jangid 2006). Some reinforced concrete (RC) bridge columns, even those built according to ductile design principles, were damaged in the 1999 Chi-Chi earthquake. Thus, it is very important to evaluate the seismic response of a RC bridge column to improve its seismic design and prevent future damage. Nonlinear time history analysis using step-by-step integration is capable of tracing the dynamic response of a structure during the entire vibration period and is able to accommodate the pulsing wave form. However, the accuracy of the numerical results is very sensitive to the modeling of the nonlinear load-deformation relationship of the structural member. FEMA 273 and ATC-40 provide the modeling parameters for structural nonlinear analyses of RC beams and RC columns. They use three parameters to define the plastic rotation angles and a residual strength ratio to describe the nonlinear load- deformation relationship of an RC member. Structural nonlinear analyses are performed based on these parameters. This method provides a convenient way to obtain the nonlinear seismic responses of RC structures. However, the accuracy of the numerical solutions might be further improved. For this purpose, results from a previous study on modeling of the static pushover analyses for RC bridge columns (Sung et al. 2005) is adopted for the nonlinear time history analysis presented herein to evaluate the structural responses excited by a near-fault ground motion. To ensure the reliability of this approach, the numerical results were compared to experimental results. The results confirm that the proposed approach is valid. Strong near-fault ground motion, usually caused by fault-rupture and characterized by a pulse-like velocity-wave form, often prompted dramatic instantaneous seismic energy (Jadhav and Jangid 2006). Some reinforced concrete (RC) bridge columns, even those thus, it is very important to evaluate the seismic response of a RC bridge column to improve its seismic design and prevent future damage. Nonlinear time history analysis using step- by-step integration is capable of tracing the dynamic response of a structure during the entire vibration period and is able to accommodate the pulsing wave form. However, the accuracy of the numerical results is very sensitive to the modeling of the nonlinear load-deformation relationship of the structural member. FEMA 273 and ATC-40 provide the modeling parameters for structural nonlinear analyzes of RC beams and RC columns. They use three parameters to define th Structural nonlinear analyzes are performed on these members. This method provides a convenient way to obtain the nonlinear load-deformation relationship of an RC member. However, the accuracy of the numerical solutions might be further improved. For this purpose, results from a previous study on modeling of the static pushover analyzes for RC bridge columns (Sung et al. 2005) is adopted for the nonlinear time history analysis presents herein to evaluate the confirmation of the reliability of a near-fault ground motion. The results confirm that the proposed approach is valid.
其他文献
通过固相反应法合成了具有光致变色性质的La_((2-x)/3)(Ag_((1-2x)/3~((0))Ag_x~((Ⅰ)))TO_3(简称Ag-LST)钙钛矿结构复合氧化物粉体,采用XRD、XPS、ICP和SEM等实验技术对Ag-L
背景长期照护,这个直接从英文Long-term Care翻译过来的专业术语,一般是指为失能人群提供生活照料、康复护理、精神慰藉、社会交往和临终关怀等综合性、专业化的服务,也有人
鸡西矿业集团公司张辰煤矿西三采区3
期刊
校长在学校中是否真正处在核心的地位,能否卓有成效地开展工作,取决于校长的管理能力和自身专业素质。在新的教育常态下,现代学校管理呈现出新的特征:把师生摆在学校管理的参
知识教学的推进过程本就是在问题的不断提出与解决的循环往复当中完成的.问题的存在,为知识思维的拓展与深入提供了前提条件,也成为了学习效果达成的内在驱动力量.在不同内容
本文采用二维河流模型,对跨河桥梁围堰事故下悬浮物的扩散规律及危险品运输事故下污染物的运移规律进行模拟,预测分析了扰动状态下悬浮物的影响范围及危险品污染团到达目标水
执法人员在统计执法检查中,发现造成统计指标差错的原因有多种,有对指标不理解的,有统计工作不规范的,有内部管理有问题的,有不重视统计工作的等等。但有一种情况让执法人员
本文结合建筑施工项目成本管控的具体实际,对成本控制在建筑施工项目中价值与意义作简要的分析,并对当前建筑施工项目中成本控制的问题和难点进行详细的讨论与阐述,参考建筑
通常在企业中有不少人非常有才华,却老是在做人处事方面得罪人,无法使自己的横溢才华充分发挥出来,如此无疑会对自己的事业造成严重的影响,一不小心,都足以毁掉你的事业。因
音乐剧是两栖歌唱家发展的一个大舞台,他们在音乐剧中的演唱具体表现为两种演唱方法的不同综合形式:一种是将美声唱法与流行唱法融合统一,称为“融合”;另一种是将美声唱法与