论文部分内容阅读
序言庙岭水库位于吉林省永吉县西南双河镇乡庙岭村倒木河上,1966年开始兴建大坝,1970年6月竣工蓄水。坝高20.4m,坝顶高程396.7m,坝长600 m。上坝坝型为辗压式肥心墙坝。采用垂直防渗,0+025-0+103为日伪时期挖掘的基槽,0+103-0+200为1967年至1968年重新开挖的截水槽,0+200-0+420为日伪时挖的基槽,质量甚差。0+420-0+590无截水槽,总观坝基垂防标准低,处理也不彻底。库区天然铺盖不好(见图1),蓄水运行后,曾在坝后先后出现13处漏水,6处出现大面积混浊水,致使水库主体工
Preamble Miaoling Reservoir is located in Jiulum River, Miaoling Village, Shuanghe Town, southwest of Yongji County, Jilin Province. The dam was started in 1966 and completed in June 1970. Dam height 20.4m, crest elevation 396.7m, dam length 600m. On the dam type rolling fat core wall dam. Vertical seepage control, 0 +025-0 +103 for the excavation of the base period of the puppet period, 0 +103 -0 +200 for 1967 to 1968 re-excavation of the cut-off trough, 0 +200 -0 +420 for the day Pseudo-dug when the base groove, poor quality. 0 +420 -0 +590 without interception tank, the total view of the dam base vertical anti-standard low, the treatment is not complete. The natural distribution in the reservoir area is not good (see Figure 1). After the water storage operation, 13 leaks occurred successively in the dam area and 6 large areas of turbid water appeared, causing the main reservoir workers