论文部分内容阅读
近日,紫金矿业集团股份有限公司控股俄罗斯龙兴克兹尔-塔什特克铅锌多金属矿项目举行投产剪彩仪式。俄罗斯图瓦共和国主席绍尔班·瓦列里耶维奇、黑龙江省省长助理赵杰、紫金矿业总裁王建华、龙兴集团董事长马云等出席剪彩仪式。克兹尔-塔什特克铅锌多金属矿为高品质特大型矿山,矿床金属储量约160万吨,其中锌130万吨、铅20万吨、铜8万吨,伴生金、银,项目设计规模年处理矿量100万吨。项目
Recently, Zijin Mining Group Co., Ltd. held the Russian Longxingkezier - Tashtech lead-zinc polymetallic ore project held its ribbon-cutting ceremony. Shawanese Valeryevich, chairman of Russia’s Tuva Republic, Zhao Jie, assistant to governor of Heilongjiang Province, Wang Jianhua, president of Zijin Mining, and Ma Yun, chairman of Longxing Group attended the ribbon-cutting ceremony. The Kzalt-Tashtek lead-zinc polymetallic ore is a high-quality and large-scale mine with a deposit of about 1.6 million tons of metal, including 1.3 million tons of zinc, 200,000 tons of lead and 80,000 tons of copper, with associated gold and silver projects Design scale annual processing capacity of 1 million tons of ore. project