论文部分内容阅读
水利工程建设,季节性、单件性强,闲工期长,一般地处偏僻,运输困难,容易造成人力和财力上的浪费,因而一向有“水大头”之称。就是指施工不注意成本核算,大手大脚,损耗多,浪费大。如何改变这种状况,尽快地摘掉“水大头”的帽子,这是我们水利施工单位提高经济效益的当务之急。几年来,我们在改善经营管理、降低工程成本方面做了一些努力,取得了一定的成绩,主要是从以下三个方面做起的。
The construction of water conservancy projects is characterized by seasonality, strong individuality, and long working hours. It is generally remote and difficult to transport. It is prone to waste of manpower and financial resources. Therefore, it has always been known as the “water head”. It refers to the construction does not pay attention to cost accounting, lavish, loss and waste. How to change this situation, as soon as possible to remove the “water big head” hat, this is the top priority for our water conservancy construction units to improve economic efficiency. Over the past few years, we have made some efforts to improve management and reduce engineering costs. We have achieved certain results, mainly starting from the following three aspects.