以上海地铁7号线北延伸陆翔路站—潘广路站区间隧道工程为背景,从盾构设备改造、盾构推进控制、施工监测3个方面介绍盾构切削钢筋混凝土桩穿越厂房的施工技术,对同类工程具有一定参考价值。
Based on the tunnel project of Lu Xiang Road Station - Pan Guang Road Station in northern extension of Shanghai Metro Line 7, this paper introduces the construction technology of shield cutting reinforced concrete piles through the workshop from three aspects of shield equipment modification, shield propulsion control and construction monitoring. The project has a certain reference value.