苏4-10X井,是华北油田在霸州苏桥区块部署的一口储气库井,储气库井井身结构复杂,施工工序多,施工工艺难度大,特别是储气库井身设计使用寿命要求较长,储气库运行工况条件苛刻,要求盖层以上500-800米水泥封固段固井质量必须到达优质,三开中完井深4608米,进入潜山5米,在三开1200余米裸眼的裸眼内共钻穿12层累计44米厚的煤层,井壁不稳定,承压能力不好,为了顺利下入套管,提高顶替效率,保证固井质量,通过强化井眼准备,校核套管刚度,优选前置液和水泥浆体系及压力校核计算等有效措施,严格施工,最终保证了苏4-10X井尾管固井质量,解决了苏桥潜山储气库井尾管固井中存在的问题,为华北储气库以后类似固井方式积累了宝贵经验。
Su 4-10X well is a gas storage well that is deployed in the Suqiao block of Bazhou in Huabei Oilfield. The structure of gas well and well bore is complex with many construction processes, and the construction process is very difficult. In particular, the wellbore design Long service life requirements and harsh operating conditions of the gas storage. It is required that the cementing quality of the cement sealing section of 500-800 m above the overburden has to reach the high quality. The completion depth of the open section is 4608 meters and the depth of the buried hill is 5 meters. Open 1,200 meters naked eye naked eye drilling a total of 12 layers of accumulated 44 meters thick coal seam, wall instability, pressure capacity is not good, in order to smoothly into the casing, to improve replacement efficiency, to ensure the quality of cementing, through the reinforcement well Eye preparation, checking casing stiffness, optimizing preflush and grouting systems and pressure check calculation and other effective measures, and rigorous construction, finally ensuring the Su 4-10X well tailing cementing quality, to solve the Suqiao buried gas reservoir The problems in the well-tail pipe cementing have accumulated valuable experience for similar cementing methods after the North China gas storage.