水电工程项目与传统的工程项目不同,具备一定的特殊性,并且受到各种因素的影响,导致其造价难以控制,很容易出现造价风险。在这种情况下,就要加强风险评估与预测能力,从而降低造价风险对工程项目的影响。本文分析了造价风险的影响因素,最后根据以往的工作经验总结了风险评估与预测的步骤,为后期的相关工作提供参考和借鉴。一、水电工程造价中的风险影响因素1.设计技术因素工程设计是进行水电工程建设的基础,其设计方案
Different from the traditional project, hydropower projects have certain particularities and are affected by various factors, which make it difficult to control the cost of construction and prone to cost risk. Under such circumstances, it is necessary to strengthen risk assessment and forecasting capabilities so as to reduce the impact of construction cost risk on the project. This paper analyzes the influencing factors of cost risk, and finally summarizes the steps of risk assessment and forecast based on past work experience, which provides reference and reference for the related work in the later period. First, the risk factors in hydropower project cost 1. Design and technical factors Engineering design is the basis for the construction of hydropower projects, the design options