四川省渔子溪二级水电站是国家重点建设工程,电站机组列为机械部国家38项重点科研项目之一。电站计划装机4台,单机容量为4万千瓦。1982年经水电部、机械部安排由天津发电设备厂试制。于1984年12月底基本完成第一台机组的试制任务。 两部委托天津市第一机械工业局和水电部水电建设总局主持召开了产品出厂前预验收会议。会议于1985年4月22日至26日在天津发电设备厂召开,17个单位的53位代表参加了会议。 与会代表听取了天发厂关于机组研制工作的汇报,审阅了有关文件,抽查了部分主要零部件的加工质量和试装情况。
Hydropower Station of Sichuan Province Yuzixi Hydropower Station is a national key construction project, and the unit of power station is listed as one of 38 key scientific research projects of the Ministry of Machinery. Power station plans to install 4 units, stand-alone capacity of 40,000 kilowatts. In 1982 by the Ministry of Water Resources, Ministry of Machinery arranged by Tianjin power plant trial. At the end of December 1984 basically completed the trial production of the first unit. Two commissioned Tianjin First Machinery Industry Bureau and the Ministry of Water and Electric Power Construction Bureau presided over the pre-acceptance of products manufactured before the meeting. The meeting was held in Tianjin Power Generation Equipment Factory from April 22 to April 25, 1985, and 53 delegates from 17 units attended the meeting. The participants listened to the report of Tianfa Plant on the unit development work, reviewed the relevant documents, checked the processing quality and test equipment of some major components.