论文部分内容阅读
根据许漯高速公路的施工情况,确定了沥青混合料的碾压温度,提出了有效压实时间的概念,并分析了其影响因素和确定方法,为合理配备压实机械提供了理论指导。
According to the construction condition of Xu-Luo Expressway, the rolling temperature of asphalt mixture is determined, the concept of effective compaction time is put forward, the influencing factors and determination methods are analyzed, which provide theoretical guidance for the reasonable allocation of compaction machinery.